Web Analytics Made Easy - StatCounter

Tender for The Financial Year 2024-25 For All Types Of Building Construction Materials Like Cement,rebar Ballast,muram,boulder Etc.rates - Flooring 1'' In Sq. Ft., Flooring 2'' In Sq. Ft., Flooring 3'' In Sq. Ft., Granite In Sq. Ft., Paver Plain 60 Mm In Sq. Ft., Paver Reflected 60 Mm In Sq. Ft., 100 Mm In Sq. Ft., Dholpur Stone In Sq. Ft., Jaali In Sq. Ft., Green Marble In Sq. Ft., Bacterified Tiles In Sq. Ft., Glazed Tiles In Sq. Ft., Cement Per Big, Steel 6,8,10,12,16 Dia In Kg., Steel Plate In Kg., Corrugated Sheet 45 Mm In Sq.m., Corrugated Sheet 65 Mm. In Square Meter, Plastic Coated Sheet, Brick (in Thousands), Binding Wire In Kilograms, Birla White Cement In Kilograms, Jcb Rent For 1 Hour, Tractor Tanker Per Piece Tractor Trolley Per Piece, Centering Shuttering In Square Feet, Building In Kilograms, Narmada Sand In Cubic Meter, Black Sand In Cubic Meter, 40 Mm Ballast In Cubic Meter, 20 Mm Ballast In Cubic Meter, 6, 10 Mm Ballast In Cubic Meter, Boulder In Cubic Meter, Murram In Cubic Meter, Distemper, Oil Paint Per Liter, Stone Dust Per Cubic Meter, Black Soil Per Cubic Meter, Angle Per Kilogram, Plastic Paint Per Liter, Pvc Pipe 3/4 Inch, Pvc Pipe 1 Inch, Pvc Pipe 1.5 Inch, Pvc Pipe 2 Inch, Kota Stone, G.i Pipe 1/2 Inch, G.i. I Pipe 3/4 Inch, G.i Pipe 2 Inch, G.i Pipe 1 Inch, Wash Basin 24 Inch, W.c. Sheet 8 Inch, Urinal 10 Inch, Conduit Pipe For Light, Pcv Water Tank/liter, Barber Wire In Kg, Barbed Wire In Kg, Changing Mesh In Kg, Water Proof Putty In Kg, Di Valve 100 Mm Dia Per Piece, Di Valve 150 Mm Dia Per Piece, Di Valve 200 Mm Dia Per Piece, Di Valve 100 Mm Dia Per Piece, Di Valve 315 Mm Dia Per Piece, Rolling Shutter In Kg, Steel Railing In Per Foot, M/s Railing In Kg, Boring 8'' Per Foot, Casing Pipe 8'' Per Foot, Gi Sheet In Per Foot, Centering In Per Cubic Meter, Plumber In Per Trap, Tiles Fitting, Labour Rate Gravel In Cubic Meter, Brick Joining Labour Rate In Cubic Meter, Labour In Power Square Feet Rate, Excavation Labour Rate In Cubic Meter, Plaster Labour Rate In Square Meter, Painting Labour Rate In Square Meter, Putty Labour Rate In Square Meter, Hdpi Pile Rate Per Meter, Iron Binding Rate Per Meter, Cement Pole Installation With Cable Of 8 Meter Height Labour Rate, Gi Sheet Labour Rate In Square Feet, Soil Scraping Work In Garden Labour Rate In Square Meter in Rajgarh-Mp - Madhya Pradesh

Tender Details
Reference # :
37404213
Description :
Tenders for The Financial Year 2024-25 For All Types Of Building Construction Materials Like Cement,rebar Ballast,muram,boulder Etc.rates - Flooring 1'' In Sq. Ft., Flooring 2'' In Sq. Ft., Flooring 3'' In Sq. Ft., Granite In Sq. Ft., Paver Plain 60 Mm In Sq. Ft., Paver Reflected 60 Mm In Sq. Ft., 100 Mm In Sq. Ft., Dholpur Stone In Sq. Ft., Jaali In Sq. Ft., Green Marble In Sq. Ft., Bacterified Tiles In Sq. Ft., Glazed Tiles In Sq. Ft., Cement Per Big, Steel 6,8,10,12,16 Dia In Kg., Steel Plate In Kg., Corrugated Sheet 45 Mm In Sq.m., Corrugated Sheet 65 Mm. In Square Meter, Plastic Coated Sheet, Brick (in Thousands), Binding Wire In Kilograms, Birla White Cement In Kilograms, Jcb Rent For 1 Hour, Tractor Tanker Per Piece Tractor Trolley Per Piece, Centering Shuttering In Square Feet, Building In Kilograms, Narmada Sand In Cubic Meter, Black Sand In Cubic Meter, 40 Mm Ballast In Cubic Meter, 20 Mm Ballast In Cubic Meter, 6, 10 Mm Ballast In Cubic Meter, Boulder In Cubic Meter, Murram In Cubic Meter, Distemper, Oil Paint Per Liter, Stone Dust Per Cubic Meter, Black Soil Per Cubic Meter, Angle Per Kilogram, Plastic Paint Per Liter, Pvc Pipe 3/4 Inch, Pvc Pipe 1 Inch, Pvc Pipe 1.5 Inch, Pvc Pipe 2 Inch, Kota Stone, G.i Pipe 1/2 Inch, G.i. I Pipe 3/4 Inch, G.i Pipe 2 Inch, G.i Pipe 1 Inch, Wash Basin 24 Inch, W.c. Sheet 8 Inch, Urinal 10 Inch, Conduit Pipe For Light, Pcv Water Tank/liter, Barber Wire In Kg, Barbed Wire In Kg, Changing Mesh In Kg, Water Proof Putty In Kg, Di Valve 100 Mm Dia Per Piece, Di Valve 150 Mm Dia Per Piece, Di Valve 200 Mm Dia Per Piece, Di Valve 100 Mm Dia Per Piece, Di Valve 315 Mm Dia Per Piece, Rolling Shutter In Kg, Steel Railing In Per Foot, M/s Railing In Kg, Boring 8'' Per Foot, Casing Pipe 8'' Per Foot, Gi Sheet In Per Foot, Centering In Per Cubic Meter, Plumber In Per Trap, Tiles Fitting, Labour Rate Gravel In Cubic Meter, Brick Joining Labour Rate In Cubic Meter, Labour In Power Square Feet Rate, Excavation Labour Rate In Cubic Meter, Plaster Labour Rate In Square Meter, Painting Labour Rate In Square Meter, Putty Labour Rate In Square Meter, Hdpi Pile Rate Per Meter, Iron Binding Rate Per Meter, Cement Pole Installation With Cable Of 8 Meter Height Labour Rate, Gi Sheet Labour Rate In Square Feet, Soil Scraping Work In Garden Labour Rate In Square Meter
Ownership :
Sector :
Tender Values
Value :
2,000,000
EMD :
15,000
Doc. Cost :
5,000
Important Dates
Due date :
18 Sep, 2024
Open date :
20 Sep, 2024
Publish date :
03 Sep, 2024
Location
Location :
Rajgarh-Mp - Madhya Pradesh ( IN )
Connect us via What's Up