Description :
Tenders for Providing Of Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 7 And 8; Service Charge Per Team Per Day 8 Hrs Work And 1 Bid Lump Sum Qty Is Equal To 70 Nos Of Task; As Per Scope Of Work And Atc,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 7 And 8; Conveyance Charges Per Team Per Visit To Rr Site And Back And 1 Bid Lump Sum Qty Is Equal To 90 Nos Of Task; As Per Scope Of Work And Atc,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 7 And 8; Callout Charges For Visiting At Site If No Job Is Available Or Provided After Arrival At Site On Receipt Of Site Arrival Intimation And 1 Bid Lump Sum ..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 7 And 8; Re Injection Charges If Leak Reappears During 31 To 45 Days Of Initial Sealing And 1 Bid Lump Sum Qty Is Equal To 10 Nos Of Task; As Per Scope Of Work A..