Description :
Tenders for , Earth Work: Raising Of 1.5 M In Cutting And Digging Up To 50 M And Installing Dog Well, Cambering In Hoda, Grading And Levelling And Dressing Of Soil In Hard Soil., , Laying And Supplying Of Quarry Gravel Containing 40% Stone Spall Or Gravel Or Ghadla, Sprinkling Of Water And Ramming With Mortar., , Laying Cement Concrete For Road Foundation And Operating Needle And Surface Vibrating Machine And Mixing Broken Aggregates From 40 Mm Crusher To Prepare It In Desired Grade, Camber And Super Elevation. Grit(crusher Broken) Stone, , 1:04:08, , 40 Mm. If Hand Broken Gravel Is Used In Place Of Crushed Stone Ballast, The Same Amount Will Be Payable But There Will Be A 30% Reduction In The Rate., , Construction Of Floor/road With Interlocking Cement Concrete Blocks (grade M-30, Manufactured From Fully Computerized Automatic Stationary Hydraulic Vibropressed Machine And Batching Plant Of Class A As Per Bs 6717:2001) Including Supply And Installation Of Edge Blocks. In Case Of Not Installing Edge Blocks, 0.08 Cubic Meter/running Meter Of Cement Concrete Rate Of 1:1.5:3 Should Be Deducted., , 80 Mm Thick, , Edge Block Will Include A Block Made Of Cement Concrete 1:1.5:3 Or Stone Block With A Thickness Of 20 Cm, Height Of 40 Cm And The Top Edge Of The Block Will Be Rounded. Instead Of The Block, A Block Made On The Spot Of The Same Size Will Also Be Acceptable. In Case Edge Block Is Not Installed On The Spot, A Deduction Of 0.08 Cubic Meter Of Cement Concrete Per Running Meter Should Be Made., , A, , Mixing And Pouring Controlled Concrete On The Top Surface Of Cement Concrete Road And Operating Needle And Surface Vibration Machines (vibrators) And Preparing It To The Desired Grade, Chamfer And Super Elevation For A Non-slip Surface., , 1:02:04, , For Drain, ,