Description :
Tenders for Provn Of Flooring - Dismantling Of The Existing Side Walls, Front Pillars, Front Wall And Flooring , Removing The Malwa Waste From The Site And Dumping 50 To 70 Meters Away From Scn , Raising The Floor Height By 6-8 Inches By Filling Of Waste Material , Pcc Flooring Mix Of Cement, Sand And Aggregate. , Installation Of 1 Ft X 1 Ft Chekker Tiles With Complete Furnishings