Web Analytics Made Easy - StatCounter

Tender for Comprehensive Operation And Maintenance Of The Project Mainly Water Treatment Plant, Different Class, Type And Diameter Pipes, Pump Houses, Sumps, Rcc Esr, H.g.l.r, Sluice Valves, Flow Meters, Non-return Valve, Pump, Motor, Capacitor, L.t. Panels, L.t. Cables And Transformer Installed At Headwork And Sub Headwork. Work Includes Replacement Of Spares For All Equipment And Maintenance Of All Civil Structures And All Electro-mechanical Installation Etc. Complete. Including Submission Of Periodic Mis Reports On Software. Supply Of Potable Water In Accordance, Maintaining Residual Chlorine, Bleaching Powder, Pac And All Consumables. All Type Operations, Preventive Maintenance, Overhauls And Repair/ Break Down Maintenance For Civil / Mechanical & Electrical Works. Providing Prescribed Nos. Of Qualified And Experienced Staff For Overall Management Of O&m Work As Per Detailed Specification & Obligatory Requirement For 24 Months. Excluding Electric Power, Raw Water Cost, Undersurendranagar Integrated Water Supply Scheme Phase-2, Part B Project, Based On Sukhbhadardam Tal.- Sayla, Dist.- Surendranagar As Per Tender. in Limbdi - Gujarat

Tender Details
Reference # :
39557920
Description :
Tenders for Comprehensive Operation And Maintenance Of The Project Mainly Water Treatment Plant, Different Class, Type And Diameter Pipes, Pump Houses, Sumps, Rcc Esr, H.g.l.r, Sluice Valves, Flow Meters, Non-return Valve, Pump, Motor, Capacitor, L.t. Panels, L.t. Cables And Transformer Installed At Headwork And Sub Headwork. Work Includes Replacement Of Spares For All Equipment And Maintenance Of All Civil Structures And All Electro-mechanical Installation Etc. Complete. Including Submission Of Periodic Mis Reports On Software. Supply Of Potable Water In Accordance, Maintaining Residual Chlorine, Bleaching Powder, Pac And All Consumables. All Type Operations, Preventive Maintenance, Overhauls And Repair/ Break Down Maintenance For Civil / Mechanical & Electrical Works. Providing Prescribed Nos. Of Qualified And Experienced Staff For Overall Management Of O&m Work As Per Detailed Specification & Obligatory Requirement For 24 Months. Excluding Electric Power, Raw Water Cost, Undersurendranagar Integrated Water Supply Scheme Phase-2, Part B Project, Based On Sukhbhadardam Tal.- Sayla, Dist.- Surendranagar As Per Tender.
Ownership :
Sector :
Tender Values
Value :
27,050,891
EMD :
270,600
Doc. Cost :
3,600
Important Dates
Due date :
24 Mar, 2025
Open date :
24 Mar, 2025
Publish date :
04 Mar, 2025
Location
Location :
Limbdi - Gujarat ( IN )
Connect us via What's Up