Description :
Tenders for Construction Of Checkdam Cum Bridge Includes Construction Of Abutment Main Pier Dummy Pier Apron Pier Cap And Deck Slab. Construction Of Protection Wall Along The River (u/s And D/s And Dr Wall On Both Sides) At A Height Of 4 M And 3.5m.