Description :
Tenders for Custom Bid For Services - Yearly Routine Of Fm 200 System-e-065: - Yearly Routines Are Falling Due On Fm-200 System Of This Unit. |routines To Be Carried Out As Per Maintenance Schedule And System To Be Proved For Satisfactory Operation. Following Jobs To Be Carried Out As Part Of The Routines: () After Removal Of Solenoid Valve From Fm-200 Cylinder Head Of The System, The Following Checks Need To Be Carried Out: Electric Remote Cabinet Opening |from Remote And Pneumatic Release Cabinets. () Systems Check- Checks Each Electrical Manual Release Unit For Operation. (ii) Check Fire Alarm And Evacuation Alarm Lights And Sounds. (iv) Check That All Ac Are Shut Down Or Dampers Are Closed, If Any. (v) Check That All Pneumatic Actuator Operates After Pre-set Time Delay. (vii) Check Operation Of Discharge Pressure Switch And Check Indicator Lamp. (viii) Reset All Pneumatic Actuator, Electrical Actuators, Discharge Pressure Switch And Fire Alarm System. (ix) Pipe Work/ Nozzle To Ensure That They Are Free From Debris. (x) Check Dust Caps Are Fitted. (xi) Containers - Check Containers Are Safe Mechanical Damage, Corrosion Or Unauthorized Interference. (xi) Check Containers Brackets Are Fitted And All Bolts Tightened. (xii) Chek Pneumatic Actuation Tubing Is Firmly Fixed And All Connections Are |tight..