Description :
Tenders for Supply Of Dclc Solutions For Hpc Testbed Cluster Cdac Pune - Cooling Distribution Unit Rack Based With Primary And Secondary Connection Kit, Hose, Flange Etc. , Under Floor Piping Work And Connection To Cdus And Manifolds Along With Grooved Fittings Etc. , Supply And Return Manifold 42u With 36 Nodes Each Side , Cold Plate Pair Suitable For Intel Sapphire-emerald Rapids. Along With Tube Of Appropriate Length With Quick Disconnect Dripless Connectors , Coolant For Secondary Network , Any Other Items -components Required To Complete The Scope , Any Other Charges Required To Complete The Dclc Solutions In Total. , Charges Towards - Installation, Commissioning, Testing Etc.