Description :
Tenders for Providing Of Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-424; E 085 Both Da Exhaust Line Sea Water Leakage And Salt Formation Observed In Both Da Exhaust Line In Way Job Includes A Test Water Injection Pipe And Nozzle ..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-424; E 086 Chequered Plate Chequered Plates Carpet Area Approx 12 Mtrs In Engine Room And Water Jet Are Highly Rusted Deteriorated All Plates Along With Supportin..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-424; E 087 Lagging Lagging Is Required To Be Renewed At Below Mentined Location A Hot Lagging In Engine Room On Port And Stbd Side Area 5 Sqmtrs B Aluminium Laggi..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-424; E 088 Port Gear Box Sea Water Cooling Line Following Jobs To Be Undertaken On Gear Box Sea Water Cooler Cooling Pipe Line A Chemical Cleaning Of Port Gear Bo..