Description :
Tenders for Supplying And Fixing Of Smart Class And Development Of Rooms At Ghps School At Kerehalli Village In Koppal Taluka - Unbranded Alloy World Cantilever Office Chair Non Revolving And Non Tilting Chair With Armrest, Smart Class Finger Tip Interactive Panel Solution For Instution With Warranty 3 Years Interactive Flat Panel 65 Inch, Supplying Of Ceiling Fan With Capacitor Rating As Per Guideline Of Bee 5 Star Rating And Is 374/19 And Also Comply With Is 1709/1984 With Latest Amendment, Rated Voltage 220 V/50 Hz, Rated Power Upto 35 W +/- 10 %, Rated Current As Per Is 374/19, Rated Power Factor 0.9 Lagging(min), Rated Speed 350 +/- 10% Rpm, Rated Air Delivery 210 +/- 10% Cubic Meter Minimum, Rated Service Value 6.2 Cmm / W, Three Blades Of Blade Leaf 1.05 Mm Thick Aluminium Alloy Sheet,, Dell 1024 Gb Storage Laptop Notebook Base Processor Number For Higher Processor Higher Processor Number Intel Core 7 150 U Operating System Factory Pre Loaded Window 11 Home Ram Size Gb 16 Display Size In Cm Diagonal 35.56 To 37.07 14 Into 14.99 In Capacity Of Storage Drive In Gb 1024, Providing And Fixing Anodised Aluminium Grill (anodised Transparent Or Dyed To Required Shade According To Is 1868 With Minimum Anodic Coating Of Grade Ac 15, Providing And Fixing Glazing In Aluminium Door, Window, Ventilator Shutters And Partitions Etc. With Epdm Rubber / Neoprene Gasket Etc. Complete As Per The Architectural Drawings And The Directions Of Engineer-in-charge . (cost Of Aluminium Snap Beading Shall Be Paid In Basic Item)with Float Glass Panes Of 8 Mm Thickness (weight Not Less Than 20 Kg/ M2) Including Cost Of Materials, Labour, Usage Charges Of Machinery Complete As Per Specifications., Painting On G.s. Sheet With Synthetic Enamel Paint Of Approved Brand And Manufacture Of Required Colour To Give An Even Shade New Work (two Coats) Including A Coat Of Approved Steel Primer But Excluding A Coat Of Mordant Solution Including Preparing The Surface After Thorougly Cleaning Oil, Grease, Dirt And Foreign Matter, Cost Of Materials, Labour Complete As Per Specifications And As Per Directions Of Engineer-in-charge., Finishing Walls With Textured Exterior Paint Of Required Shade New Work (two Coats Applied At 3.28 L/10 M2) Over And Including Priming Coat Of Exterior Primer Applied At 2.20kg/10 M2 To Give An Even Shade After Thoroughly Brooming The Surface To Remove All Dirt, Dust, Mortar Drops And Foreign Matter Including Preparing The Surface Even And Sand Paper Smooth, Cost Of Materials, Labour Complete As Per Specifications And As Per Directions Of Engineer-in-charge