Description :
Tenders for Corrigendum : Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 100 M3/hr And 2 No. 50 M3/hr Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room And Backwash Water Disposal At Head