Description :
Tenders for Corrigendum : Complete Fabrication Of One No. (01) Double-stack Pontoon With A Total Of 80 Drums (48 Drums On Top Of The 32 Drums At The Bottom) For 2000 Gpm Motor Installation At The New Eastern Side Sump Of Jocp In The Hzb Area.