Web Analytics Made Easy - StatCounter

Tender for Tender For Comprehensive Annual Maintenance Contract (amc) Low Side Hvac Equipment At Iiit-delhi Okhla Phase-iii, New Delhi-, Chiller -1 , Chiller-2 , Chiller-3 , Secondary Pump (30 Kw)-1 , Secondary Pump (30 Kw)-2 , Primary Pump (7.5 Kw)-1 , Primary Pump (7.5 Kw)-2 , Primary Pump (7.5 Kw)-3 , Condenser Pump (22 Kw)-1 , Condenser Pump (22 Kw)-2 , Condenser Pump (22 Kw)-3 , Cooling Tower -1 With Vfd , Cooling Tower -2 With Vfd , Cooling Tower -1 With Vfd , Cooling Tower -12 With Vfd, Hwg-1 , Hwg-2 , Btu Meter , Btu Meter , Closed Expansion , Tank , Pressurization Unit , Tertiary Pump-1 , Academic Block , Tertiary Pump-2 , Academic Hlock , Tertiary Pump-1 , Hostel Block-1 , Tertiary Pump-2 , Hostel Block-1 , Tertiary Pump-1 , Hostel Block-2 , Tertiary Pump-1 , Hostel Block-2 , Tertiary Pump-1 Hostel Gi , Tertiary Pump-2 Hostel Gi , Tertiary Pump-1 , Hostel G2 , Tertiary Pump 2 , Hostel G2 , Tertiary Pump-1 , Hostel B1 , Tertiary Pump 2 , Hostel Bi , R & D Block-ahu , Ground Flour , Lecture Hall-1 , Lecture Hall-2 , B-003 Class Room , B-003 Class Room , First Floor , Lah , Room-1 , Room-1 , Lecture Hall-1 , Lecture Hall-2 , Room-2 , Room-2, Heat Recovery Wheel , 2nd Floor , 3rd Floor , 3rd Floor , Heat Reclaim Ventilation , 2nd Floor To Sixth Floor Academic , Axial Fan , 7th Floor Ab , 2nd Floor &1& 2nd Floor 300 Seater , 7th Floor Ab & 1st Floor Lb 500 Seater , Ground Floor Ab , Ground Floor Ab , First Floor Ab , 2nd Floor To Sixth Floor (ab) , Ground Floor Sports Block , 2nd Floor Lecture Block , Hostel 1 & Ii Terrace For Lift Lobby , 3rd Floor Lecture Block , Terrace Ab & Terrace Faculty Block , Terrace Lb , Terrace Lecture/sports Block , Inline Fan , Sports Block/hostel-, Sports Block , Sports Block/hostel 1/, Academic Block , Academic Block , Lecture Block, in Delhi - Delhi

Tender Details
Reference # :
40227588
Description :
Tenders for Tender For Comprehensive Annual Maintenance Contract (amc) Low Side Hvac Equipment At Iiit-delhi Okhla Phase-iii, New Delhi-, Chiller -1 , Chiller-2 , Chiller-3 , Secondary Pump (30 Kw)-1 , Secondary Pump (30 Kw)-2 , Primary Pump (7.5 Kw)-1 , Primary Pump (7.5 Kw)-2 , Primary Pump (7.5 Kw)-3 , Condenser Pump (22 Kw)-1 , Condenser Pump (22 Kw)-2 , Condenser Pump (22 Kw)-3 , Cooling Tower -1 With Vfd , Cooling Tower -2 With Vfd , Cooling Tower -1 With Vfd , Cooling Tower -12 With Vfd, Hwg-1 , Hwg-2 , Btu Meter , Btu Meter , Closed Expansion , Tank , Pressurization Unit , Tertiary Pump-1 , Academic Block , Tertiary Pump-2 , Academic Hlock , Tertiary Pump-1 , Hostel Block-1 , Tertiary Pump-2 , Hostel Block-1 , Tertiary Pump-1 , Hostel Block-2 , Tertiary Pump-1 , Hostel Block-2 , Tertiary Pump-1 Hostel Gi , Tertiary Pump-2 Hostel Gi , Tertiary Pump-1 , Hostel G2 , Tertiary Pump 2 , Hostel G2 , Tertiary Pump-1 , Hostel B1 , Tertiary Pump 2 , Hostel Bi , R & D Block-ahu , Ground Flour , Lecture Hall-1 , Lecture Hall-2 , B-003 Class Room , B-003 Class Room , First Floor , Lah , Room-1 , Room-1 , Lecture Hall-1 , Lecture Hall-2 , Room-2 , Room-2, Heat Recovery Wheel , 2nd Floor , 3rd Floor , 3rd Floor , Heat Reclaim Ventilation , 2nd Floor To Sixth Floor Academic , Axial Fan , 7th Floor Ab , 2nd Floor &1& 2nd Floor 300 Seater , 7th Floor Ab & 1st Floor Lb 500 Seater , Ground Floor Ab , Ground Floor Ab , First Floor Ab , 2nd Floor To Sixth Floor (ab) , Ground Floor Sports Block , 2nd Floor Lecture Block , Hostel 1 & Ii Terrace For Lift Lobby , 3rd Floor Lecture Block , Terrace Ab & Terrace Faculty Block , Terrace Lb , Terrace Lecture/sports Block , Inline Fan , Sports Block/hostel-, Sports Block , Sports Block/hostel 1/, Academic Block , Academic Block , Lecture Block,
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
21 May, 2025
Open date :
21 May, 2025
Publish date :
05 May, 2025
Location
Location :
Delhi - Delhi ( IN )
Connect us via What's Up