Description :
Tenders for Supply Of Material And Labour For Conducting Soil Investigation By Drilling Boreholes Dia 150 Mm And Depth 06 Point 0m Or At Which Further Boring Is Restricted Refusal , Material And Labour For Preparing Trial Pit Size 1 Point 20 M Into X 1 Point 20 M 5 Point 00m Away From Bh Both Centrally Placed Upto Depth , Following Parameters Will Form Part Of The Soil Investigation Report To Be Submitted By The Consultants , A Detailed Site Plan Showing The Outline Of The Proposed Building And Approx Location Of Each Bore Hole Duly Numbered As Per Log Of Bore Hole Should Be Enclosed Location Of Foundation , Conducting Field California Bearing Ratio As Per Is 2720 Part31 1995 Cbr Is The Ratio Of Force Per Unit Area Required To Penetrate Soil Mass With A Standard Circular Piston