Web Analytics Made Easy - StatCounter

Tender for Annual Rate: 2025-26 Rates Of Supplying, Stacking Bituminious Materials And Labour Work On Various Roads Of Vyara And Dolvan Taluka Dist- Tapi. - Providing And Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99 Percentage By Weight Of Mix For Mixing And 2.5kg/10 Smt Asphalt Vg-30 For Tack Coat And Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Manual Laying Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractors Own Machinaries, Drum Mix Plant And Mannual Finish Etc. Complete. (manual Laying), Providing And Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99 Percentage By Weight Of Mix For Mixing And 2.5 Kg/10 Smt Asphalt Vg-30 For Tack Coat And Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Laying With Paver Finisher Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractors Own Machinaries, Drum Mix Plant And Paver Finisher Etc. Complete. (paver Finish), Providing, Laying And Rolling 37.5 Mm Compacted Thick B.m. In One Layer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg10 For Mixing With Aggregate At The Rate Of 3.4percentage I.e. 34kg/m.t. Of Total Mix Including Heating And Mixing In Drum Mix Plant And Transporting Spreading The Same By Manual Laying And Cosolidation With Vibratory Roller Including Necessary Firewood, Oil, Lubricants, Labour Charges, Using Contractors Own Drum Mix Plant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (manual Laying), Providing, Laying And Rolling 37.5 Mm Compacted Thick B.m. In One Layer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg10 For Mixing With Aggregate At The Rate Of 3.4percentage I.e. 34kg/m.t. Of Total Mix Including Heating And Mixing In Drum Mix Plant And Transporting Spreading The Same By Paver Finisher And Cosolidation With Vibratory Roller Including Necessary Firewood, Oil, Lubricants, Labour Charges, Using Contractors Own Drum Mix Plant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (paver Finish), Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36percentage By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Manual Laying And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene,fire Wood Labour Charges Etc Comp.with Contractors Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (manual Laying), Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36percentage By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Paver Finsiher And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene,fire Wood Labour Charges Etc Comp.with Contractors Own Machineries And Equipment Tools Etc. Complete In Accord in Vyara - Gujarat

Tender Details
Reference # :
40277992
Description :
Tenders for Annual Rate: 2025-26 Rates Of Supplying, Stacking Bituminious Materials And Labour Work On Various Roads Of Vyara And Dolvan Taluka Dist- Tapi. - Providing And Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99 Percentage By Weight Of Mix For Mixing And 2.5kg/10 Smt Asphalt Vg-30 For Tack Coat And Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Manual Laying Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractors Own Machinaries, Drum Mix Plant And Mannual Finish Etc. Complete. (manual Laying), Providing And Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99 Percentage By Weight Of Mix For Mixing And 2.5 Kg/10 Smt Asphalt Vg-30 For Tack Coat And Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Laying With Paver Finisher Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractors Own Machinaries, Drum Mix Plant And Paver Finisher Etc. Complete. (paver Finish), Providing, Laying And Rolling 37.5 Mm Compacted Thick B.m. In One Layer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg10 For Mixing With Aggregate At The Rate Of 3.4percentage I.e. 34kg/m.t. Of Total Mix Including Heating And Mixing In Drum Mix Plant And Transporting Spreading The Same By Manual Laying And Cosolidation With Vibratory Roller Including Necessary Firewood, Oil, Lubricants, Labour Charges, Using Contractors Own Drum Mix Plant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (manual Laying), Providing, Laying And Rolling 37.5 Mm Compacted Thick B.m. In One Layer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg10 For Mixing With Aggregate At The Rate Of 3.4percentage I.e. 34kg/m.t. Of Total Mix Including Heating And Mixing In Drum Mix Plant And Transporting Spreading The Same By Paver Finisher And Cosolidation With Vibratory Roller Including Necessary Firewood, Oil, Lubricants, Labour Charges, Using Contractors Own Drum Mix Plant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (paver Finish), Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36percentage By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Manual Laying And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene,fire Wood Labour Charges Etc Comp.with Contractors Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (manual Laying), Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36percentage By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Paver Finsiher And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene,fire Wood Labour Charges Etc Comp.with Contractors Own Machineries And Equipment Tools Etc. Complete In Accord
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
50,000
Doc. Cost :
1,500
Important Dates
Due date :
20 May, 2025
Open date :
20 May, 2025
Publish date :
08 May, 2025
Location
Location :
Vyara - Gujarat ( IN )
Connect us via What's Up