Description :
Tenders for Supply Of Stainless Steel Tubes And Double Ferrule Fitting For Lhb First Ac Coaches, A S Per Drawing: Material Schedule As Per Set List No Rcf/md/mat Schedule/lwfac Version 00 With Design Correction Slip Cs-01 Dated 10/04/2025, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To B E Protected With Suitable Covering To Prevent It From Damage. However Transit Damag E If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delive Ry ]