Web Analytics Made Easy - StatCounter

Tender for Supply Of Set Of Items For Gauge Column (part Finished) For X-class Locomotives To The Following Drawings. Item 01: Gauge Column (part Finished Lh) For Top Cock As Per Drg No Goc/x/sk-2-16522, Qty-01 No. Item 02: Gauge Column (part Finished Rh) For Top Cock As Per Drg No Goc/x/sk-2-16522, Qty- 01 No. Item 03: Gauge Column (part Finished Lh) For Bottom Cock As Per Drg No Goc/x/sk-2-16520, Qty-01 No. Item 04: Gauge Column (part Finished Rh) For Bottom Cock As Per Drg No Goc/x/sk-2-16520, Qty-01 No. Note: 1) Item 01 To 04 Consists Of 01 Set. 2) All Threads Should Be As Per Bsw Standards. 3) Each I Tem Should Have One Integral Test Piece And Is To Be Parted In Presence Of Railway Inspection Authority And Handed Over For Inspection Before Machining [ Wa Rranty Period: 30 Months After The Date Of Delivery ] in Multi City - Multi State

Tender Details
Reference # :
40642927
Description :
Tenders for Supply Of Set Of Items For Gauge Column (part Finished) For X-class Locomotives To The Following Drawings. Item 01: Gauge Column (part Finished Lh) For Top Cock As Per Drg No Goc/x/sk-2-16522, Qty-01 No. Item 02: Gauge Column (part Finished Rh) For Top Cock As Per Drg No Goc/x/sk-2-16522, Qty- 01 No. Item 03: Gauge Column (part Finished Lh) For Bottom Cock As Per Drg No Goc/x/sk-2-16520, Qty-01 No. Item 04: Gauge Column (part Finished Rh) For Bottom Cock As Per Drg No Goc/x/sk-2-16520, Qty-01 No. Note: 1) Item 01 To 04 Consists Of 01 Set. 2) All Threads Should Be As Per Bsw Standards. 3) Each I Tem Should Have One Integral Test Piece And Is To Be Parted In Presence Of Railway Inspection Authority And Handed Over For Inspection Before Machining [ Wa Rranty Period: 30 Months After The Date Of Delivery ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
27 Jun, 2025
Open date :
27 Jun, 2025
Publish date :
07 Jun, 2025
Location
Location :
Multi City - Multi State ( IN )
Connect us via What's Up