Web Analytics Made Easy - StatCounter

Tender for Signalling And Telecom Outdoor Cable Shifting Work Including Other Gears Inconnection With Following Work: (i) Strengthening/rehabilitation/reconstruction Of 10 Nos. Of Bridges (bridge No- 20, 25, 29, 65, 49, 48, 38, 41, 76 & 86 (5 Nos. Box And 5 Nos. Pipe Pushing) In Tkx-bksc-ksx-muri Section Of Adra Division. Project Id: 12.01.32.24.3.50.009,(ii) Proposal For Conversion Of 11 Nos. Of (bridge No. 35, 36, 34up, 34dn, 343rd, 528, 528, 528, 528, 11 & 2bk) 1x12.2mg Span Steel Girders Into 1x12.2mg Psc Girder Including Rcc Jackting Bet Adra-asansol, Ksx-bksc, Tle-bksc And Dma-kpk Section In Adra Division. Project Id: 12.01.32.24.3.50.006,(iii) Construction Of New Crew Lobby, Crew Waiting Hall, Crew Counseling Room, Toilet For Ladies & Gents On The 1st Floor Of The El Building At Anara.project Id: 12.01.16.21.1.55.002,(iv) Estimate In Connection For Augmentation Of Existing Crew Lobby At Bksc.project Id: 12.01.16.21.1.55.002,(v) Provision Of Earth Leakage Detector (eld) In Various Location In Adra Division.project Id: 12.01.33.24.4.50.001.(vi) Strengthening/rehabilitation/reconstruction Of Bridges, 31 No. By Pipe Pushing And 08 No. Rehabilitation In Mdn-gba Section. (project Id: 12.01.32.23.1.11.002).(vii) Strengthening/rehabilitation/reconstruction Of Bridges, 27 No. By Pipe Pushing And 08 No. Rehabilitation In Gba. (project Id: 12.01.32.23.1.11.003) In Adra Division. in Asansol - West Bengal

Tender Details
Reference # :
40737418
Description :
Tenders for Signalling And Telecom Outdoor Cable Shifting Work Including Other Gears Inconnection With Following Work: (i) Strengthening/rehabilitation/reconstruction Of 10 Nos. Of Bridges (bridge No- 20, 25, 29, 65, 49, 48, 38, 41, 76 & 86 (5 Nos. Box And 5 Nos. Pipe Pushing) In Tkx-bksc-ksx-muri Section Of Adra Division. Project Id: 12.01.32.24.3.50.009,(ii) Proposal For Conversion Of 11 Nos. Of (bridge No. 35, 36, 34up, 34dn, 343rd, 528, 528, 528, 528, 11 & 2bk) 1x12.2mg Span Steel Girders Into 1x12.2mg Psc Girder Including Rcc Jackting Bet Adra-asansol, Ksx-bksc, Tle-bksc And Dma-kpk Section In Adra Division. Project Id: 12.01.32.24.3.50.006,(iii) Construction Of New Crew Lobby, Crew Waiting Hall, Crew Counseling Room, Toilet For Ladies & Gents On The 1st Floor Of The El Building At Anara.project Id: 12.01.16.21.1.55.002,(iv) Estimate In Connection For Augmentation Of Existing Crew Lobby At Bksc.project Id: 12.01.16.21.1.55.002,(v) Provision Of Earth Leakage Detector (eld) In Various Location In Adra Division.project Id: 12.01.33.24.4.50.001.(vi) Strengthening/rehabilitation/reconstruction Of Bridges, 31 No. By Pipe Pushing And 08 No. Rehabilitation In Mdn-gba Section. (project Id: 12.01.32.23.1.11.002).(vii) Strengthening/rehabilitation/reconstruction Of Bridges, 27 No. By Pipe Pushing And 08 No. Rehabilitation In Gba. (project Id: 12.01.32.23.1.11.003) In Adra Division.
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
08 Jul, 2025
Open date :
08 Jul, 2025
Publish date :
16 Jun, 2025
Location
Location :
Asansol - West Bengal ( IN )
Connect us via What's Up