Description :
Tenders for Corrigendum : Carrying Out Bank To Bank Cross Section Survey Work Of Canal Channel For A Width Upto 50.00 M With Both Side Offsets Upto 5.00 M And Levels Being Taken At An Interval Of Maximum 2.00 M Or At Representative Point And Long Section Survey Work 30.00