Description :
Tenders for Runningcontractfordepositworksunderedd-jaisinghpur,sultanpur. - Part-a (material), Following Materials Supplied By The Contractor :-, Stone Pad., Lt Clamp With Nut & Bolts., Earth Wire Clamp With Nut & Bolts., Clamp For Top/t-off/dropper., Suspension Clamp., Dead End Clamp., Eye Hook., Eye Hook Clamp., X-arm Holding Clamp., Red Oxide Paint., Alluminium Paint., F-bracket., Guarding Angle., Guarding Angle Clamp., Shackle Insulator., Distribution Box 3 Phase With Clamp., Stay Loop Insulator, Bolts, Nuts & Washers All Sizes., L.t. Connector (pearcing)., Safe Carriage/cartage Of Following Items From Store Centre, Sultanpur To Work Site Including Loading, Unloading And Proper Stacking (distance Within 0-50 Km.), Safe Carriage Of Stp 11 Mtr., Safe Carriage Of Pcc Pole 8.5 Mtr. Long., Safe Carriage Of Acsr Weasel Conductor/dog Conductor., Safe Carriage Of 11 Kv Xlpe Cable Al. 3x120/3x70 Sq.mm., Safe Carriage Of Lt Xlpe Cable Abc 1 Phase/3 Phase., Safe Carriage Of Meter Qubical., Safe Carriage Of Ct/pt Combinud Unit., Safe Carriage Of T/f 25 Kva., Safe Carriage Of T/f 63 Kva., Safe Carriage Of T/f 100 Kva., Safe Carriage Of T/f 250 Kva., Safe Carriage Of T/f 400 Kva., Safe Carriage Of Other Line Materials., Dragging Of Stp From Site To Pit Point., Dragging Of Pcc Pole From Site To Pit Point., Fabrication & Errection Of Single Pole 11 Mtr Support On Stp Including Digging Of Pit & Fixing Of All Accessories And Clamps As Per Respo Norms., Fabrication & Errection Of Double Pole 11 Mtr Support On Stp Including Digging Of Pit & Fixing Of All Accessories And Clamps As Per Respo Norms., Fabrication & Errection Of Single Pole Support On Pcc Pole Including Digging Of Pit & Fixing Of All Accessories And Clamps As Per Respo Norms., Fabrication & Errection Of Double Pole Support On Pcc Pole Including Digging Of Pit & Fixing Of All Accessories And Clamps As Per Respo Norms., Grouting Of Structure By Digging Od Pit 1.83 Mtr. Deep For 11 Mtr Stp/8.5 Mtr Pcc Pole Foundation Is Provided With Help Of Steel Or Wooden Formers, Groutung With 1:4:5 Ratio Cement, Sand & First Class Brick Ballast 0.285 Cu Mtr For 11 Mtr Stp/8.5 Mtr Pcc Pole Plinthing 0.3 Mtr Above G/l And Proper Plastering As Per Respo Norms., Earthing Of 11 Mtr Stp/8.5 Mtr Pcc Pole As Per Respo Norms., Stay Complete., Laying Stringing & Sagging Of New Acsr Weasel Conductor/dog Conductor Including Binding Jumpering Etc., Digging Of Trench & Laying Of Cable 11 Kv Xlpe Cable 3x120/3x70 Sq.mm Including Sands & Brick., Hanging Hosting & Clamping And G.i. Pipe Channel Nut & Bolts 3x120/3x70 Sq Mm Xlpe 11 Kv Cable (cost Of All Accessories Will Be Borne By Contractor) As Per Resspo Norms., Installation And Fixing Of Heat Shrinkable Type 11 Kv Cable Joiting Kit 3x120/3x70 Sq Mm Xlpe Cable Box As Per Norms., High Pressure Testing After Completion Of Laying Of 11 Kv Xlpe Cable, Fixing Of Joints & Termination. (testing Equipment Shall Be Arranged By The Contractor)., Making Cable Jointing Kit I/d & O/d 3x120/3x70 Sq.mm., Installation Of Meter Qubical., Installation Of Ct/pt Combinud Unit., Route Cable Marker With Size 3x1.5 Feet Stone For Underground Cable At Every 100 Mtr From Initial Point With Notice "11 Kv U/g Line" Painted On It (all The Material, Manpower And T&p Will Be Arranged By The Contractor At His Own Cost)., Road Restoration Charges For Pucca Road Crossing., Road Restoration Charges For Footpath Side., Laying Stringing & Sagging Of Lt Xlpe Cable Abc 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 Sq.mm., Erection And Mounting Of 25 Kva T/f., Erection And Mounting Of 63 Kva T/f., Erection And Mounting Of 100 Kva T/f., Providing And Installation Of Smc Box For 25 Kva To 100 Kva., Installation Of 250/400 Kva T/f On Plinth., Construction Of Plinth For 250/400 Kva T/f Including Of All Material As Per Respo Norms., Fencing Work Suitable Of 250/400 Kva T/f Plinth Of Size 15x12x8 And Angles Of Suitable Size Should Be Grou