Description :
Tenders for Deposite Work Under Edsd- Rania - Carriage Of Following Material From Store Center Or From Any Other Place To The Respective Site Of Work Distence Up To 75 Km Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work., 8.5 Mtr Pcc Pole, 11 Mtr Stp, Different Line Material ( Conductor, X-arm,channel, Insulator , G.i. Wire , Stay Wire & Rod, Earth Rod , Db Box Etc.), Different Capacity Dt( 100/63/25/16/10 Kva ), Pilfer Unit , Ct/pt Double Metering Unit ., Erection Of Following Material :, X-arm Holding Clamp / Holding Clamp With N&b, F- Clamp With N&b, I/d & O/d Type Cable Jointing Kit Suitable For 11 Kv Xlpe Cable ( Different Size), Stay Insulator, G.i. Pipe 6" Dia, Stone Pad, Anti Climbing Device As Per Respo Norms ( With Barbed Wire ), Danger Board As Per Respo Norms., Erection Of Following Material Including The Work Of Complete H.t. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. (with Proper Earthing.), Single Pole Structure Of 8.5 Mtr Pcc Pole, Single Pole Structure Of 11 Mtr Stp Pole, Double Pole Structure Of 8.5 Mtr Pcc Pole, Double Pole Structure Of 11 Mtr Stp Pole, Stay Set, Laying Of 11 Kv Xlpe Cable (different Size ) As Per Respo Manual And As Per Direction Of Je Inchrge., Laying Of 11 Kv Xlpe Cable (different Size ) Inside G.i. Pipe ., Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Weasal/racoon /dog Conductor On The Newly Erected Pole/ Old Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carries Etc. Required For Proper Completion Of Work., Grouting Of Pole As Per Respo Norms ( Cement, Sand , Blast Stone With The Ration 1:4:8 Will Be Provided By Contractor ), Grouting Of Stay Set( Cement, Sand , Blast Stone With The Ration 1:4:8 Will Be Provided By Contractor ), Muffing Of S.t.p. As Per Respo Norms ( Require Material Will Be Provided By Contractor ), Dismantling Of Existing 33kv/11 Kv / L.t. Line And Removal Of All Accessories & Fittings From Poles, Re-rolling Of Conductor And Proper Stacking And Cartage Of Dismantled Conductor & Accessories From Site Of Work To Dvvnl, Store., Making Joint With The Help Of Cable Jointing Kiit (11 Kv ), Mounting Of D.t. (100/63/25/16/10 Kva ) Upon Double Pole As Per Respo Manual., Installation Of Ct/pt Unit As Per Respo Manual., Installation & Grouting Of Pilfer Unit As Per Respo Manual., Cutting Of Tree Branches For Clearness Of Line.