Description :
Tenders for Providing Of Custom Bid For Services - Custom Bid For Services - Rake Decantation Work; Obhs And Related Service For Railways (new Version 2.0)-scope Of Work Includes Decantation Of Full/partially Rake Filled With Petrol (ms) And Diesel (hsd) Into Existing Petrol (ms) And Diesel (hsd) Tanks Through Existing Pumping And Piping Facilities By Connecting Of Flexible Hose In Between Tank Wagon & Piping Header. 1. Contractor Has To Available At Site With His All Manpower (total 10 Nos. Manpower) At Least 30 Minutes Before Placing Of Filled Rake At Omc Siding. 2. Necessary Liasioning Need To Be Done By Contractor For Rake Placement With Railway. 3. Once The Rake Is Placed At Omc Railway Siding Contractor Has To Check All Seals, Cover And Number Of Wagons Before Connection Of Flexible Hose Pipe. 4. After Checking The Wagons Contractor Has To Do Sampling & Qc (temperature, Density And Visual Check Of Product) Of All Wagons In Presence Of Bpcl Officer. 5. Once Qc Is Over Dipping Of Each Wagon To Be Done In Presence Of Bpcl Officer. 6. After Dipping Of The Wagons Flexible Hose Connection Need To Do In Between Ms/hsd Wagons And Ms/hsd Existing Piping Header Respectively In Presence Of Bpcl Officer. 7. After Hose Connection Contractor Needs To Start Decantation Of Tank Wagons Through Pumping Into Existing Ms/hsd Tank. 8. After Starting Of Decantation Of Tank Wagons One Person Should Be Present In Siding Pump House For Operating & Monitoring Of Pumps And One In Tank Farm For Checking The Level & Changing Of Tanks Until Tank Wagons Are Fully Decanted. 9. Once Decantation Over All Wagon S Emptiness Needs To Be Checked And Master Valves & Man Way Cover To Be Closed If Wagons Are Empty. 10. After Decantation Flexible Hose Connection Need To Be Removed And Kept At Specific Location. 11. All Bottom Nozzles Of Wagons Need To Be Closed Properly With Blind Plate After Hose Disconnection. 12. Release Memo Issued By Bpcl Officer Need To Be Submit By Contractor Supervisor To Aonla Railway Station. 13. All Tools, Tackles & Equipment For The Above Job Is In Scope Of Vendor. 14. Vendor Has To Use Non-sparking Tool For Above Jobs And All Non-sparking Tools Is In Scope Of Vendor. 15. All The Above Work Needs To Be Complete Within 8 Hrs. If Rake Decantation Delayed (beyond 8 Hrs.) Due To Contractor Issue, Then Demerge Charged By Railway Need To Be Paid By Contractor Himself. 16. Line Drain Needs To Be Done In Ag/ug Tank After Decantation..