Description :
Tenders for Impeller For Fume Extraction System No 3 As Per Rwf Drawing No 721 9003 1 0280. Note:-a)the Tenderer Shall Be A Reputed Blower/impeller Manufacturer And Have I Nhouse Facility For Manufacture & Testing. Documentary Evidence Should Be Furnished While Submitting The Offer. B) Supplier Shall Be Required To Submit Dynamic Balancing C Ertificate Along With Supply. C)the Impeller Should Be Supplied In Assembled Condition A Long With Shaft. D) The Supply Shall Be Guaranteed For Quality,workmanship & Perform Ance For A Minimum Period Of 12 Months From The Date Of Fitment Or 18 Months From Th E Date Of Supply. Any Replacement During This Period Shall Be Free Replacement. [ Warra Nty Period: 18 Months After The Date Of Delivery ]