Description :
Tenders for Fitment And Air Leakage Testing Of All Brake Piping Arrangement On Lhb Bogies As Per Drg No. Lgs/eog/asr-3-2-011 Alt'-r' And Pneumatic Piping Arrangement With Fiba Fitted On Lhb Bogies In Secondary Suspension As Per Drg. No. Lw36014 Alt'b' And Lw36189 Alt'g' As Per Wi No. Plw2572 Version 1.0 Dated 21.03.2025