Web Analytics Made Easy - StatCounter

Tender for Rrsmp/25-26 Araria/11 - Ghora Chowk Sindhiya To Sidhiya South Yadav Tola, Clearing And Grubbing :- Clearing And Grubbing Road Land (by Manual Means) Including Uprooting Wild Vegetation, Grass, Bushes, Shrubs, Saplings And Trees Of Girth Upto 300mm, Removals Of Stumps Of Such Trees Cut Earlier & Disposal Of Unserviceable Materials & Stacking Of Serviceable Materials To Be Used Or Auctioned Upto A Lead Of 1000 M Including Removal And Disposal Of Top Organic Soil Not Exeeding 150mm In Thickness As Per Technical Specification Clause 201.1 And Direction Of E/i, Construction Of Embankment With Material Obtained From Borrow Pits With A Lift Upto 1.5 M , Transporting To The Site Spreading , Grading To Required Slope And Compacting To Meet Requirement Of Tables 300.1 And 300.2 With A Lead Upto 1000 M & 100 M As Per Technical Specification Clause 301.5 ., For 1000 M Lead, Construction Of Subgrade And Earthen Shoulders :- Construction Of Subgrade And Earthen Shoulders With Approved Material Obtained From Borrow Pits With All Lifts And Leads, Transporting To Site, Spreading, Grading To Required Slope And Compacted To Meet Requirement Of Table 300.2 With Lead Upto 1000 M As Per Technical Specification Clause 303.1., Granular Sub-base With Well Graded Material(grade I) :- Construction Of Granular Sub-base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401., Granular Sub-base With Well Graded Material(grade Ii) :- Construction Of Granular Sub-base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401., Water Bound Macadam Gr Iii :- Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Hand Packing, Rolling With Smooth Wheel Roller 80-100 Kn In Stages To Proper Grade And Camber, Applying And Brooming, Stone Screening To Fill-up The Interstices Of Coarse Aggregate, Watering And Compacting To The Required Density Grading 3 As Per Technical Specification Clause 405., Wet Mix Macadam (wmm) :- Providing Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mixer (pug Mill) Carraige Of Mixed Material By Tipper To Site,laying In Uniform Layers In Sub-base/base Course On A Well Prepared Sub-base And Compacting With Smooth Wheel Roller Of 80 To 100kn Weight To Achieve The Desired Density Including Lighting, Barricading And Maintainance Of Diversion, Etc As Per Tables 400.11 & 400.12 And Technical Specification Clause 406., Prime Coat :- Providing And Applying Primer Coat With Bitumen Emulsion (ss-1) On Prepared Surface Of Granular Base Including Cleaning Of Road Surface And Spraying Primer At The Rate Of 0.70- 1.0 Kg/sqm Using Mechanical Means As Per Technical Specification Clause 502., Tack Coat :- Providing And Applying Tack Coat With Bitumen Emulsion Using Emulsion Pressure Distributor At The Rate Of 0.25 To 0.30 Kg Per Sqm On The Prepared Granular Surface Tretaed With Primer And Clened With Hydriloc Broom As Per Technical Specification Aclouse 503., Semi Dense Bituminous Concrete :- Providing And Laying Semi Dense Bituminous Concrete With 100-120 Tph Batch Type Hmp Producing An Average Output Of 75 Tonnes Per Hour Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder @ 4.5 To 5 Per Cent Of Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth in Araria - Bihar

Tender Details
Reference # :
41166635
Description :
Tenders for Rrsmp/25-26 Araria/11 - Ghora Chowk Sindhiya To Sidhiya South Yadav Tola, Clearing And Grubbing :- Clearing And Grubbing Road Land (by Manual Means) Including Uprooting Wild Vegetation, Grass, Bushes, Shrubs, Saplings And Trees Of Girth Upto 300mm, Removals Of Stumps Of Such Trees Cut Earlier & Disposal Of Unserviceable Materials & Stacking Of Serviceable Materials To Be Used Or Auctioned Upto A Lead Of 1000 M Including Removal And Disposal Of Top Organic Soil Not Exeeding 150mm In Thickness As Per Technical Specification Clause 201.1 And Direction Of E/i, Construction Of Embankment With Material Obtained From Borrow Pits With A Lift Upto 1.5 M , Transporting To The Site Spreading , Grading To Required Slope And Compacting To Meet Requirement Of Tables 300.1 And 300.2 With A Lead Upto 1000 M & 100 M As Per Technical Specification Clause 301.5 ., For 1000 M Lead, Construction Of Subgrade And Earthen Shoulders :- Construction Of Subgrade And Earthen Shoulders With Approved Material Obtained From Borrow Pits With All Lifts And Leads, Transporting To Site, Spreading, Grading To Required Slope And Compacted To Meet Requirement Of Table 300.2 With Lead Upto 1000 M As Per Technical Specification Clause 303.1., Granular Sub-base With Well Graded Material(grade I) :- Construction Of Granular Sub-base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401., Granular Sub-base With Well Graded Material(grade Ii) :- Construction Of Granular Sub-base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401., Water Bound Macadam Gr Iii :- Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes To Water Bound Macadam Specification Including Spreading In Uniform Thickness, Hand Packing, Rolling With Smooth Wheel Roller 80-100 Kn In Stages To Proper Grade And Camber, Applying And Brooming, Stone Screening To Fill-up The Interstices Of Coarse Aggregate, Watering And Compacting To The Required Density Grading 3 As Per Technical Specification Clause 405., Wet Mix Macadam (wmm) :- Providing Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mixer (pug Mill) Carraige Of Mixed Material By Tipper To Site,laying In Uniform Layers In Sub-base/base Course On A Well Prepared Sub-base And Compacting With Smooth Wheel Roller Of 80 To 100kn Weight To Achieve The Desired Density Including Lighting, Barricading And Maintainance Of Diversion, Etc As Per Tables 400.11 & 400.12 And Technical Specification Clause 406., Prime Coat :- Providing And Applying Primer Coat With Bitumen Emulsion (ss-1) On Prepared Surface Of Granular Base Including Cleaning Of Road Surface And Spraying Primer At The Rate Of 0.70- 1.0 Kg/sqm Using Mechanical Means As Per Technical Specification Clause 502., Tack Coat :- Providing And Applying Tack Coat With Bitumen Emulsion Using Emulsion Pressure Distributor At The Rate Of 0.25 To 0.30 Kg Per Sqm On The Prepared Granular Surface Tretaed With Primer And Clened With Hydriloc Broom As Per Technical Specification Aclouse 503., Semi Dense Bituminous Concrete :- Providing And Laying Semi Dense Bituminous Concrete With 100-120 Tph Batch Type Hmp Producing An Average Output Of 75 Tonnes Per Hour Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder @ 4.5 To 5 Per Cent Of Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth
Ownership :
Sector :
Tender Values
Value :
44,704,559
EMD :
894,100
Doc. Cost :
10,000
Important Dates
Due date :
29 Jul, 2025
Open date :
29 Jul, 2025
Publish date :
22 Jul, 2025
Location
Location :
Araria - Bihar ( IN )
Connect us via What's Up