Description :
Tenders for Supply For Materials For Nrlm Shed Budling Work Under Mgnrega Scheme At Kunchuru Village - Tmt Bars Fe 500 At Kunchuru Gp Nrm Work Site, Portland Cement At Kunchuru Gp Nrm Work Site, Reeded Glass 2 Mm Thick At Kunchuru Gp Nrm Work Site, Vitrified Tiles 600x600 Mm At Kunchuru Gp Nrm Work Site, Glazed Tiles 300x450 At Kunchuru Gp Nrm Work Site, Ceramic Tiles 30 X 30 Cms At Kunchuru Gp Nrm Work Site, White Cement At Kunchuru Gp Nrm Work Site, Burnt Bricks Class 35 (non Modular) At Kunchuru Gp Nrm Work Site, Border Tiles 30 X 10 Cms At Kunchuru Gp Nrm Work Site, Name Board At Kunchuru Gp Nrm Work Site, Pvc Pipe Of 10kg Or Cum,110 Mm At Kunchuru Gp Nrm Work Site, Pvc Pipe Of 6kg Or Cum,63 Mm At Kunchuru Gp Nrm Work Site, Pvc Pipe Of 4kg Or Cum,75 Mm At Kunchuru Gp Nrm Work Site, Tw Beading For Fixing Glass At Kunchuru Gp Nrm Work Site, Casurina Poles 75 - 100 Mm Dia At Kunchuru Gp Nrm Work Site, Casurina Poles 100 - 150 Mm At Kunchuru Gp Nrm Work Site, Polythylene Pipes High Density 32mm External Dia At Kunchuru Gp Nrm Work Site, Labour Charges For Handing Errection Of Rcc Rings Etc. At 5% At Kunchuru Gp Nrm Work Site, Transportation Charges Of Materials Beyond 5 Km At 10% At Kunchuru Gp Nrm Work Site, Formwork, Centering & Scaffolding For Columns & Piers At Kunchuru Gp Nrm Work Site, Add Cutting And Other Wastage 5% At Kunchuru Gp Nrm Work Site, Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint At Kunchuru Gp Nrm Work Site, Add For Scaffolding At 5 Per Cent Of Cost Of Labour And Material At Kunchuru Gp Nrm Work Site, Add Brush, Putty, Sand Paper At 3% On Cost Of Paint At Kunchuru Gp Nrm Work Site, Add Brush, Putty, Sand Paper At 2% On Cost Of Paint At Kunchuru Gp Nrm Work Site, Add Brush, Putty, Glue At 5% On Cost Of Paint At Kunchuru Gp Nrm Work Site, Add Brush, Putty At 5% On Cost Of Distemper Primer At Kunchuru Gp Nrm Work Site, Add Providing And Removing Scaffolding At 3% On Labour At Kunchuru Gp Nrm Work Site, Add Watering Charges At 1 % On Labour At Kunchuru Gp Nrm Work Site, Add White Cement For Pointing At 2% On Material At Kunchuru Gp Nrm Work Site, Add Handling , Loading And Unloading At 2% On Material At Kunchuru Gp Nrm Work Site, Handling Loading And Unloading 3% On Material At Kunchuru Gp Nrm Work Site, Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material At Kunchuru Gp Nrm Work Site, Add Watering Charges At 1 % On Material At Kunchuru Gp Nrm Work Site, Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Material At Kunchuru Gp Nrm Work Site, Add 5% For Fittings And Wastage Charges At Kunchuru Gp Nrm Work Site, Add Handling , Loading And Unloading At 1% On Material At Kunchuru Gp Nrm Work Site, Add Cement Sand And Grit 1% On Material At Kunchuru Gp Nrm Work Site, Ready Mix Primer Paint (ready Mix Red Lead Paint) At Kunchuru Gp Nrm Work Site, Enamel Paint At Kunchuru Gp Nrm Work Site, Distemper Primer At Kunchuru Gp Nrm Work Site, Polyenthylene Water Storage Tank Of Specified Capacity L At Kunchuru Gp Nrm Work Site, Binding Wire At Kunchuru Gp Nrm Work Site, Plasticizer / Super Plasticizer At Kunchuru Gp Nrm Work Site, Water Proofing Cement Paint At Kunchuru Gp Nrm Work Site, Dry Distemper At Kunchuru Gp Nrm Work Site, Fabrication Charges. At Kunchuru Gp Nrm Work Site, Cost Of 6.5mm M.s. Coil At Kunchuru Gp Nrm Work Site, Z Section At Kunchuru Gp Nrm Work Site, Mullion Section At Kunchuru Gp Nrm Work Site, T Section At Kunchuru Gp Nrm Work Site, Whitening At Kunchuru Gp Nrm Work Site, Mixer (concrete Small Used In Culvert) At Kunchuru Gp Nrm Work Site, Unit Cost As Per The Specification At Kunchuru Gp Nrm Work Site, Add At Kunchuru Gp Nrm Work Site, Stays At Kunchuru Gp Nrm Work Site, Hinges 5 Inches Heavy Duty At Kunchuru Gp Nrm Work Site, Handles At Kunchuru Gp Nrm Work Site, Ms Clamps At Kunchuru Gp Nrm Work Site, Solid Concrete Block 40 15 20 Cms 5.00 N/sqmm At Kunchuru Gp Nrm Work Site, Bond Stone 20 X 20 X 45