Description :
Tenders for Urgent Flood Protection And Mitigation Work To Reduce Vulnerability Of People By Protection Of River Banklength 250 M At Lb Of Kangsaboti Occurred Due To Heavy Rainfall And Subsequently High Discharge From14.07.2025 To18.07.2025 At Mouza Tentulia