Web Analytics Made Easy - StatCounter

Tender for Unit Koress 224 Elgi Compressor Repairing Work And Spare Parts --, Mild Steel Screw Air Compressor Gear Set, , Stainless Steel Screw Compressor Hose Pipe, , , , , , 1. Compressor Block With Head, , Air Compressor Couplings, , , , 1/2 Inch Non Return Valve, , Shaft Cren Rod, , , , Piston Bearing, , , , Head Packing, , , , Shaft Cren, , Mo., , Shaft Cren Beraing, , 1. Timing Chain, , , , Flange Mount, , , , Air Return Line Pipe, , , , Teped Packing, , , , Anabond Tube Big, , O Ring 145-120-25, , Taped Lock Ring Nut, , Head Piston As Per Bor Size, , Head Piston Ring As Per Size, , Temperature Sensor, , Removing The Old Temperature Sensor And Installing The New One, , Removing Old Joints Of Air Cut Out Pipes And Installing New Joints With Coating., , Remove All Old Hose Pipes And Install New Hose Pipes., , Preparing Piston Rig And Bush As Per Piston Head Over Size Bore., , Removing Old Wiring Of Panel Cut Out And Repairing It With New Cut Out., , Casting, Welding And Turning Of Air Pump Body By Lathing Machine And Fitting Of Casting Roll, , Opening, Unloading And Refitting Of Compressor Head Body By Crane., , Repairing Air Pump., , Opening The Head Assembly Of The Air Compressor And Setting The Timing And Rpm. in Pali - Rajasthan

Tender Details
Reference # :
41356711
Description :
Tenders for Unit Koress 224 Elgi Compressor Repairing Work And Spare Parts --, Mild Steel Screw Air Compressor Gear Set, , Stainless Steel Screw Compressor Hose Pipe, , , , , , 1. Compressor Block With Head, , Air Compressor Couplings, , , , 1/2 Inch Non Return Valve, , Shaft Cren Rod, , , , Piston Bearing, , , , Head Packing, , , , Shaft Cren, , Mo., , Shaft Cren Beraing, , 1. Timing Chain, , , , Flange Mount, , , , Air Return Line Pipe, , , , Teped Packing, , , , Anabond Tube Big, , O Ring 145-120-25, , Taped Lock Ring Nut, , Head Piston As Per Bor Size, , Head Piston Ring As Per Size, , Temperature Sensor, , Removing The Old Temperature Sensor And Installing The New One, , Removing Old Joints Of Air Cut Out Pipes And Installing New Joints With Coating., , Remove All Old Hose Pipes And Install New Hose Pipes., , Preparing Piston Rig And Bush As Per Piston Head Over Size Bore., , Removing Old Wiring Of Panel Cut Out And Repairing It With New Cut Out., , Casting, Welding And Turning Of Air Pump Body By Lathing Machine And Fitting Of Casting Roll, , Opening, Unloading And Refitting Of Compressor Head Body By Crane., , Repairing Air Pump., , Opening The Head Assembly Of The Air Compressor And Setting The Timing And Rpm.
Ownership :
Sector :
Tender Values
Value :
150,000
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
18 Aug, 2025
Open date :
14 Aug, 2025
Publish date :
05 Aug, 2025
Location
Location :
Pali - Rajasthan ( IN )
Connect us via What's Up