Description :
Tenders for The Main Items Included In The Estimate Are Earth Work Excavation Dry Rubble Masonry With Wearing Coat For 71m Length From Ch30 And For 20m Length From.115some Parts Of The Proposed Road Have Been Badly Potholed, So Patchwork Has Been Done Wi