Description :
Tenders for Corrigendum : Installation Of Tertiary Treatment ( Phase 1) And Diversion Of More Water To The Drying Bed Filteration System Through Digestor To Achieve More Pure Water - All The Existing Pumps Are 10 Year Old Status, Due To Additional Break Downs Achieving Required Performance Are Not Up To The Marks Due To Repeatative Break Downs. So Proposed Additonal Pumps To Maintain The Efficiency.