Description :
Tenders for Supplying All Materials, Labour, Tandp For Power Supply To Rwss Point Including 3ph3w 11 Kv Line With 55mm2 Aaac And Installation Of 1 No 25 Kva 11/0.4 Kv S/s Transformer Etc For Rpws Point To Village Singada Under Bhadrak Block - 11 Mtr Long 330kg Psc Pole, 11 Kv V Cross Arm, Back Clamp For V Cross Arm (11 Kv), 11 Kv "f" Clamp, 11 Kv Pin Insulator (polymer), 11 Kv Hw Fitting (t & C ) 45 Kn, 11kv Disc Insulator (t&c) 45 Kn Polymer, Pressure Channel 100*50*6mm Ms Channel Each 2.8mtr Long (9.2 Kg Per Mtr) * 2 Nos, Ab Switch & Hg Fuse, Mounting Channel 75*40*6 Each 2.8mtr Long 4 Nos (6.8kg Per Mtr) With Side Angle, Transformer Belting Angle 50*50*6mm 2.8mtr Long 2 Nos (4.5 Kg Per Mtr) With Side Angle, Fish Plate 50x5 Mm,2.36kg/mtr,each 0.280 Mtr Length, 6 Nos Required=(6x2.36x0.280), Ab Switch (11 Kv ,200 A. 3 Pole.50hz), Hg Fuse (11 Kv .200 A. 3 Pole.) Pi, Lightning Arrester (9 Kv,10ka) Station Class, Earthing Materials, Ht Stay Set (complete), Ht Stay Insulator, Ht Stay Clamp, 7/10 Swg Stay Wire, Gi Pipe Earthing 40mm Dia Medium Gage 3 Mtr Long, No 6/8 Gi Wire(dia4.6mm), 25x6mm Gi Flat For Neutral Earthing, 55 Mm2 Insulated Conductor, 55 Mm2 Insulated Conductor, Pg Clamp For 100mm2 Aaa Conductor, Gi Nut, Bolt & Washer Of Different Size, Earthing Of Support (coil Type), Danger Plate, Anti Climbing Device Made Of Gi Barbed Wire, Clamping Arrangement Etc. (2 Kg Per Support), 25 Kva, 11/0.4 Kv (ai) Bis Energy Level-ii, Lt Distribution Box Including Kit Kat Fuse With Mccb For 25 Kva S/s, All Cable Socket 120 Mm Sq, Materials Cost For Concreting Of 11mtr Psc Pole (2.13mtr X 0.40mtr = 0.0.29 Cum Pcc 1:3:6), Materials Cost For Concreting Of Stay (1.65mtr X 0.3mtr X 0.3mtr= 0.150 Cum Pcc 1:3:6), Sub Station Fencing With Metal Spreading, Erection Charges For Psc Pole, Erection Charges For Joist Pole & Dtr, Erection Charges Of Other Items