Web Analytics Made Easy - StatCounter

Tender for Supply Of The Materials Of Nrlm Shed Work At Halagi Gp Under Mgnrega Scheem - Tmt Bars Fe 500halagi Gp Nrlm Shed Work Site, Portland Cementhalagi Gp Nrlm Shed Work Site, Vitrified Tiles 600x600 Mmhalagi Gp Nrlm Shed Work Site, Ceramic Tiles 30 X 30 Cmshalagi Gp Nrlm Shed Work Site, Glazed Tiles 300x450halagi Gp Nrlm Shed Work Site, Reeded Glass 2 Mm Thickhalagi Gp Nrlm Shed Work Site, White Cementhalagi Gp Nrlm Shed Work Site, Border Tiles 30 X 10 Cmshalagi Gp Nrlm Shed Work Site, Brickhalagi Gp Nrlm Shed Work Site, Solid Concrete Blocks (40 20 20 Cms) 5.00 N Sqmmhalagi Gp Nrlm Shed Work Site, Name Boardhalagi Gp Nrlm Shed Work Site, Pvc Pipe Of 10kg Or Cum,110 Mmhalagi Gp Nrlm Shed Work Site, Pvc Pipe Of 6kg Or Cum,63 Mmhalagi Gp Nrlm Shed Work Site, Pvc Pipe Of 4kg Or Cum,75 Mmhalagi Gp Nrlm Shed Work Site, Polythylene Pipes High Density 32mm External Diahalagi Gp Nrlm Shed Work Site, Tw Beading For Fixing Glasshalagi Gp Nrlm Shed Work Site, Casurina Poles 100 - 150 Mmhalagi Gp Nrlm Shed Work Site, Add Brush, Putty, Glue At 5% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add Brush, Putty At 5% On Cost Of Distemper Primerhalagi Gp Nrlm Shed Work Site, Add Brush, Putty, Sand Paper At 2% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add Brush, Putty, Sand Paper At 3% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add White Cement For Pointing At 2% On Materialhalagi Gp Nrlm Shed Work Site, Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Materialhalagi Gp Nrlm Shed Work Site, Handling Loading And Unloading 3% On Materialhalagi Gp Nrlm Shed Work Site, Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Materialhalagi Gp Nrlm Shed Work Site, Add 5% For Fittings And Wastage Chargeshalagi Gp Nrlm Shed Work Site, Add Cement Sand And Grit 1% On Materialhalagi Gp Nrlm Shed Work Site, Labour Charges For Handing Errection Of Rcc Rings Etc.at 5%halagi Gp Nrlm Shed Work Site, Transportation Charges Of Materials Beyond 5 Km At 10%halagi Gp Nrlm Shed Work Site, Add Handling , Loading And Unloading At 1% On Materialhalagi Gp Nrlm Shed Work Site, Add Cutting And Other Wastage 5%halagi Gp Nrlm Shed Work Site, Add Providing And Removing Scaffolding At 3% On Labourhalagi Gp Nrlm Shed Work Site, Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add Handling , Loading And Unloading At 2% On Materialhalagi Gp Nrlm Shed Work Site, Add Watering Charges At 1 % On Labourhalagi Gp Nrlm Shed Work Site, Add Watering Charges At 1 % On Materialhalagi Gp Nrlm Shed Work Site, Distemper Primerhalagi Gp Nrlm Shed Work Site, Enamel Painthalagi Gp Nrlm Shed Work Site, Polyenthylene Water Storage Tank Of Specified Capacity Lhalagi Gp Nrlm Shed Work Site, Ready Mix Primer Paint (ready Mix Red Lead Paint)halagi Gp Nrlm Shed Work Site, Dry Distemperhalagi Gp Nrlm Shed Work Site, Water Proofing Cement Painthalagi Gp Nrlm Shed Work Site, Binding Wirehalagi Gp Nrlm Shed Work Site, Plasticizer / Super Plasticizerhalagi Gp Nrlm Shed Work Site, Whiteninghalagi Gp Nrlm Shed Work Site, Fabrication Charges.halagi Gp Nrlm Shed Work Site, Cost Of 6.5mm M.s. Coilhalagi Gp Nrlm Shed Work Site, Z Sectionhalagi Gp Nrlm Shed Work Site, Mullion Sectionhalagi Gp Nrlm Shed Work Site, T Sectionhalagi Gp Nrlm Shed Work Site, Mixer (concrete Small Used In Culvert)halagi Gp Nrlm Shed Work Site, S Or P 100mmk Traphalagi Gp Nrlm Shed Work Site, Indian Type Water Closet Of Size 580 Mm Of Specified Make With Footrestshalagi Gp Nrlm Shed Work Site, Lead Or Pvc Connection Pipe 32mm Dia (for Wash Basin)halagi Gp Nrlm Shed Work Site, C.i. / M.s. Brackets For Flushing Cisternhalagi Gp Nrlm Shed Work Site, Brass Stop Cockhalagi Gp Nrlm Shed Work Site, Cp Brass Waste 32 Mm Of Standard Patternhalagi Gp Nrlm Shed Work Site, Cp Brass Chain With Plughalagi Gp Nrlm Shed Work Site, Copper Plated Brass Piller Tap 15mmhalagi Gp Nrlm Shed Work Site, White Vitreous China Clay Flat Back in Haveri - Karnataka

Tender Details
Reference # :
41873627
Description :
Tenders for Supply Of The Materials Of Nrlm Shed Work At Halagi Gp Under Mgnrega Scheem - Tmt Bars Fe 500halagi Gp Nrlm Shed Work Site, Portland Cementhalagi Gp Nrlm Shed Work Site, Vitrified Tiles 600x600 Mmhalagi Gp Nrlm Shed Work Site, Ceramic Tiles 30 X 30 Cmshalagi Gp Nrlm Shed Work Site, Glazed Tiles 300x450halagi Gp Nrlm Shed Work Site, Reeded Glass 2 Mm Thickhalagi Gp Nrlm Shed Work Site, White Cementhalagi Gp Nrlm Shed Work Site, Border Tiles 30 X 10 Cmshalagi Gp Nrlm Shed Work Site, Brickhalagi Gp Nrlm Shed Work Site, Solid Concrete Blocks (40 20 20 Cms) 5.00 N Sqmmhalagi Gp Nrlm Shed Work Site, Name Boardhalagi Gp Nrlm Shed Work Site, Pvc Pipe Of 10kg Or Cum,110 Mmhalagi Gp Nrlm Shed Work Site, Pvc Pipe Of 6kg Or Cum,63 Mmhalagi Gp Nrlm Shed Work Site, Pvc Pipe Of 4kg Or Cum,75 Mmhalagi Gp Nrlm Shed Work Site, Polythylene Pipes High Density 32mm External Diahalagi Gp Nrlm Shed Work Site, Tw Beading For Fixing Glasshalagi Gp Nrlm Shed Work Site, Casurina Poles 100 - 150 Mmhalagi Gp Nrlm Shed Work Site, Add Brush, Putty, Glue At 5% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add Brush, Putty At 5% On Cost Of Distemper Primerhalagi Gp Nrlm Shed Work Site, Add Brush, Putty, Sand Paper At 2% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add Brush, Putty, Sand Paper At 3% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add White Cement For Pointing At 2% On Materialhalagi Gp Nrlm Shed Work Site, Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Materialhalagi Gp Nrlm Shed Work Site, Handling Loading And Unloading 3% On Materialhalagi Gp Nrlm Shed Work Site, Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Materialhalagi Gp Nrlm Shed Work Site, Add 5% For Fittings And Wastage Chargeshalagi Gp Nrlm Shed Work Site, Add Cement Sand And Grit 1% On Materialhalagi Gp Nrlm Shed Work Site, Labour Charges For Handing Errection Of Rcc Rings Etc.at 5%halagi Gp Nrlm Shed Work Site, Transportation Charges Of Materials Beyond 5 Km At 10%halagi Gp Nrlm Shed Work Site, Add Handling , Loading And Unloading At 1% On Materialhalagi Gp Nrlm Shed Work Site, Add Cutting And Other Wastage 5%halagi Gp Nrlm Shed Work Site, Add Providing And Removing Scaffolding At 3% On Labourhalagi Gp Nrlm Shed Work Site, Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Painthalagi Gp Nrlm Shed Work Site, Add Handling , Loading And Unloading At 2% On Materialhalagi Gp Nrlm Shed Work Site, Add Watering Charges At 1 % On Labourhalagi Gp Nrlm Shed Work Site, Add Watering Charges At 1 % On Materialhalagi Gp Nrlm Shed Work Site, Distemper Primerhalagi Gp Nrlm Shed Work Site, Enamel Painthalagi Gp Nrlm Shed Work Site, Polyenthylene Water Storage Tank Of Specified Capacity Lhalagi Gp Nrlm Shed Work Site, Ready Mix Primer Paint (ready Mix Red Lead Paint)halagi Gp Nrlm Shed Work Site, Dry Distemperhalagi Gp Nrlm Shed Work Site, Water Proofing Cement Painthalagi Gp Nrlm Shed Work Site, Binding Wirehalagi Gp Nrlm Shed Work Site, Plasticizer / Super Plasticizerhalagi Gp Nrlm Shed Work Site, Whiteninghalagi Gp Nrlm Shed Work Site, Fabrication Charges.halagi Gp Nrlm Shed Work Site, Cost Of 6.5mm M.s. Coilhalagi Gp Nrlm Shed Work Site, Z Sectionhalagi Gp Nrlm Shed Work Site, Mullion Sectionhalagi Gp Nrlm Shed Work Site, T Sectionhalagi Gp Nrlm Shed Work Site, Mixer (concrete Small Used In Culvert)halagi Gp Nrlm Shed Work Site, S Or P 100mmk Traphalagi Gp Nrlm Shed Work Site, Indian Type Water Closet Of Size 580 Mm Of Specified Make With Footrestshalagi Gp Nrlm Shed Work Site, Lead Or Pvc Connection Pipe 32mm Dia (for Wash Basin)halagi Gp Nrlm Shed Work Site, C.i. / M.s. Brackets For Flushing Cisternhalagi Gp Nrlm Shed Work Site, Brass Stop Cockhalagi Gp Nrlm Shed Work Site, Cp Brass Waste 32 Mm Of Standard Patternhalagi Gp Nrlm Shed Work Site, Cp Brass Chain With Plughalagi Gp Nrlm Shed Work Site, Copper Plated Brass Piller Tap 15mmhalagi Gp Nrlm Shed Work Site, White Vitreous China Clay Flat Back
Ownership :
Sector :
Tender Values
Value :
604,346
EMD :
15,500
Doc. Cost :
500
Important Dates
Due date :
01 Oct, 2025
Open date :
03 Oct, 2025
Publish date :
15 Sep, 2025
Location
Location :
Haveri - Karnataka ( IN )
Connect us via What's Up