Web Analytics Made Easy - StatCounter

Tender for Corrigendum : Purchase Of Equipments - Purchase Of Equipment, The Equipment Should Include Spray Gun, Control Unit, Powder Injector, And Powder Hopperit Should Able To Coat/spray Peek, Epoxy & Teflonit Must Work In The Following Operating Conditions1. Voltage: 1kv -110 Kv2. Current: 1ma-100 Ma.3. Main Air Pressure: 3.5 Bar To 6.5 Bar4. Powder Carrier Air Pressure: 2.0 Bar To 6.0 Bar5. Powder Hopper Pressure: 0.5 Bar To 4.0 Bar 6. Powder Feeding Rate: 1 G/min To 100 G/min7. Fluidised Powder Feeder Capacity: Min. 1.0 Litre Air Pressure And Powder Volume Must Be Controlled By Digital Valve Controllercontrol Panel Must Show Air Pressure, Powder Feed Rate, Voltage, Current And Hopper Pressurecontrol Panel And Powder Hopper Should Be Mounted On A Suitable Trolley Connecting Hoses Must Have Anti-static Propertiese-app For Monitoring And Programming The Coating Process Is Preferablecomprehensive Warranty : 2 Yearsequipment Must Be Installed And Demonstrated At Bharathiar University, Coimbatore At Free Of Costone Day Training Must Be Provided At Free Of Costjustification: This Equipment Is Required To Carry Out The Work Proposed In The R&d/ Consultancy Project Entitled Development Of Epoxy And Peek Coatings On Ndfeb Magnets By Electrostatic Spray Technique in Coimbatore - Tamil Nadu

Tender Details
Reference # :
42020688
Description :
Tenders for Corrigendum : Purchase Of Equipments - Purchase Of Equipment, The Equipment Should Include Spray Gun, Control Unit, Powder Injector, And Powder Hopperit Should Able To Coat/spray Peek, Epoxy & Teflonit Must Work In The Following Operating Conditions1. Voltage: 1kv -110 Kv2. Current: 1ma-100 Ma.3. Main Air Pressure: 3.5 Bar To 6.5 Bar4. Powder Carrier Air Pressure: 2.0 Bar To 6.0 Bar5. Powder Hopper Pressure: 0.5 Bar To 4.0 Bar 6. Powder Feeding Rate: 1 G/min To 100 G/min7. Fluidised Powder Feeder Capacity: Min. 1.0 Litre Air Pressure And Powder Volume Must Be Controlled By Digital Valve Controllercontrol Panel Must Show Air Pressure, Powder Feed Rate, Voltage, Current And Hopper Pressurecontrol Panel And Powder Hopper Should Be Mounted On A Suitable Trolley Connecting Hoses Must Have Anti-static Propertiese-app For Monitoring And Programming The Coating Process Is Preferablecomprehensive Warranty : 2 Yearsequipment Must Be Installed And Demonstrated At Bharathiar University, Coimbatore At Free Of Costone Day Training Must Be Provided At Free Of Costjustification: This Equipment Is Required To Carry Out The Work Proposed In The R&d/ Consultancy Project Entitled Development Of Epoxy And Peek Coatings On Ndfeb Magnets By Electrostatic Spray Technique
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
6,625
Doc. Cost :
NA
Important Dates
Due date :
23 Oct, 2025
Open date :
24 Oct, 2025
Publish date :
24 Sep, 2025
Location
Location :
Coimbatore - Tamil Nadu ( IN )
Connect us via What's Up