Web Analytics Made Easy - StatCounter

Tender for Bogie Frame Assly (machined) For Air Spring In Secondary Suspension For Lhbcoaches To Drg No: (a) 66703001, Col.i Alt.'c'--- (or) (b*) 834-0-3-002, Alt 'b' --- Suppliers Commitment Will Be There To Supply As Per Drawing-(a) (for Lhb Non Ac Air Spring Coaches), Or As Per Drawing -(b)(for Lhb-ac Air Spring Coaches) *for Identification Purpose Of Bogie Frame, (i)drg (a) Shall Be Marked With Yellow Paint On Brake Beam End Face On Both Sides Of Bogie Frames And N227 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate, (ii)drg (b), A242 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate. The Ratio Of Supply Between (a) & (b) Has To Be Confirmed Before The Issue Of Purchase Order. Rate Quoted Will Be Applicable To Both Drawing-(a) And Drawing-(b). Special Condition : The Material Specification For Plates Of Various Thickness Used For Fabrication Of Bogie Frame Will Be As Per En10025, Part-5, 2005 . Grade S355 J2w+n ,in Lieu Of Earlier Specified Material Grade St 52.3 And S355 J2 G3 , En10025/29 In Various Related Sub Assembly And Component Drawings And Specn.mdts-213, Rev-04 Or Latest And Mdts-166, Rev-02 Or Latest Shall Be Generally Followed. Time Lag Between Shot Blasting And Painting Should Not Be More Than 30 Minutes In Any Case. Packing Condition As Per Document No.mpm0010 E Ver-6.0 Pi159 & Packing Condition As Per Drg.no. Icf/j&t/sk-1823. [ Warranty Period: 84 Months After The Date Of Delivery ] in Multi City - Multi State

Tender Details
Reference # :
42089199
Description :
Tenders for Bogie Frame Assly (machined) For Air Spring In Secondary Suspension For Lhbcoaches To Drg No: (a) 66703001, Col.i Alt.'c'--- (or) (b*) 834-0-3-002, Alt 'b' --- Suppliers Commitment Will Be There To Supply As Per Drawing-(a) (for Lhb Non Ac Air Spring Coaches), Or As Per Drawing -(b)(for Lhb-ac Air Spring Coaches) *for Identification Purpose Of Bogie Frame, (i)drg (a) Shall Be Marked With Yellow Paint On Brake Beam End Face On Both Sides Of Bogie Frames And N227 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate, (ii)drg (b), A242 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate. The Ratio Of Supply Between (a) & (b) Has To Be Confirmed Before The Issue Of Purchase Order. Rate Quoted Will Be Applicable To Both Drawing-(a) And Drawing-(b). Special Condition : The Material Specification For Plates Of Various Thickness Used For Fabrication Of Bogie Frame Will Be As Per En10025, Part-5, 2005 . Grade S355 J2w+n ,in Lieu Of Earlier Specified Material Grade St 52.3 And S355 J2 G3 , En10025/29 In Various Related Sub Assembly And Component Drawings And Specn.mdts-213, Rev-04 Or Latest And Mdts-166, Rev-02 Or Latest Shall Be Generally Followed. Time Lag Between Shot Blasting And Painting Should Not Be More Than 30 Minutes In Any Case. Packing Condition As Per Document No.mpm0010 E Ver-6.0 Pi159 & Packing Condition As Per Drg.no. Icf/j&t/sk-1823. [ Warranty Period: 84 Months After The Date Of Delivery ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
30 Sep, 2025
Open date :
30 Sep, 2025
Publish date :
26 Sep, 2025
Location
Location :
Multi City - Multi State ( IN )
Connect us via What's Up