Web Analytics Made Easy - StatCounter

Tender for Supply Of Complete Control Cubicle Sb-2, Along With All Equipment And Cabling (excluding Control Electronics) For Wap-7 Locomotive, Confirming To All Rdso Ms Applicablefor Wap-7 Loco.including Rdso Ms-488 & 490. Spec.clw/es/3/0195 Alt. J (1) Ce Reset Mod. As Per Rdso Ms Rdso/2018/el/ms/0475 Rev.0 Except Wiring Which Should Be Done As Per Blw Letter No.23.11.2020. (2) Hotel Load Mod.as Per Clw Letter No.c-d&d/t/05 Dated 24.08.2017.(3) Mrb 3 Phase Mod.as Per Clw Letter No.c-d&d/t/42(part) Dated 27.01.2022 & Wiring As Per Blw Letter No.blw/d&d/wap-7/em/cubicle Dated 22.03.2023. (4) Led Head Light Mod. As Per Blw Letter No. Blw/d&d/wap-7/em/cubicle Dated 08.04.2023. (5) Parking Brake Mod. As Per Blw Letter No. Blw/d&d/wap-7/em/cubicle Dated 03.07.2023. [ Warranty Period: 30 Months After The Date Of Delivery ] in Multi City - Multi State

Tender Details
Reference # :
42089790
Description :
Tenders for Supply Of Complete Control Cubicle Sb-2, Along With All Equipment And Cabling (excluding Control Electronics) For Wap-7 Locomotive, Confirming To All Rdso Ms Applicablefor Wap-7 Loco.including Rdso Ms-488 & 490. Spec.clw/es/3/0195 Alt. J (1) Ce Reset Mod. As Per Rdso Ms Rdso/2018/el/ms/0475 Rev.0 Except Wiring Which Should Be Done As Per Blw Letter No.23.11.2020. (2) Hotel Load Mod.as Per Clw Letter No.c-d&d/t/05 Dated 24.08.2017.(3) Mrb 3 Phase Mod.as Per Clw Letter No.c-d&d/t/42(part) Dated 27.01.2022 & Wiring As Per Blw Letter No.blw/d&d/wap-7/em/cubicle Dated 22.03.2023. (4) Led Head Light Mod. As Per Blw Letter No. Blw/d&d/wap-7/em/cubicle Dated 08.04.2023. (5) Parking Brake Mod. As Per Blw Letter No. Blw/d&d/wap-7/em/cubicle Dated 03.07.2023. [ Warranty Period: 30 Months After The Date Of Delivery ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
17 Oct, 2025
Open date :
17 Oct, 2025
Publish date :
26 Sep, 2025
Location
Location :
Multi City - Multi State ( IN )
Connect us via What's Up