Description :
Tenders for Upgradation Of Battle Obstacle Course - Upgradation Of 9 Feet Ditch , Excavation Of Soil Up To 2 Feet , Upgradation Of 9 Feet Ditch , Filling Of Fine Narmada Sand , Upgradation Of 9 Feet Ditch , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of 9 Feet Ditch , Sand Bag Filled With Sand , Upgradation Of Get Voult , Excavation Of Soil Up To 2 Feet , Upgradation Of Get Voult , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Get Voult , Filling Of Fine Narmada Sand , Upgradation Of 5 Feet Wall , Excavation Of Soil Up To 2 Feet , Upgradation Of 5 Feet Wall , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of 5 Feet Wall , Filling Of Fine Narmada Sand , Upgradation Of 5 Feet Wall , Plastering On The Existing Wall Front And Back , Upgradation Of Elbow Lift , Excavation Of Soil Up To 2 Feet , Upgradation Of Elbow Lift , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Elbow Lift , Filling Of Fine Narmada Sand , Upgradation Of Elbow Lift , Supply And Fixing Of Wooden Pinewood , Upgradation Of Crowling , Excavation Of Soil Up To 2 Feet , Upgradation Of Crowling , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Crowling , Filling Of Fine Narmada Sand , Upgradation Of Crowling , Changing Of Existing Barbed Wire With Iron Angle , Upgradation Of Stapper , Two Coats Of Oil Paint On The Same As Approved Colour , Upgradation Of Height Stepper , Excavation Of Soil Up To 2 Feet , Upgradation Of Height Stepper , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Height Stepper , Filling Of Fine Narmada Sand , Upgradation Of Height Stepper , Supply And Fixing Of Wooden Pinewood , Upgradation Of Swing Jump , Excavation Of Soil Up To 2 Feet , Upgradation Of Swing Jump , Filling Of Fine Narmada Sand , Upgradation Of Swing Jump , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Peg Wall , Supply And Fixing Of Waterproof Ply 36mm , Upgradation Of Incline Rope , Supply And Fixing Of Texture Waterproof Ply 18mm , Upgradation Of Push Up Bar , Supply And Fixing Of Wooden Pinewood , Upgradation Of Hyper Extinction , Changing Of Ply And Cushioning , Upgradation Of Incline Sit Up Bar , Removing All Existing Round Pipe , Upgradation Of Incline Sit Up Bar , Supply And Fixing Of Outdoor Soft Mate 16mm , Upgradation Of Multi Chinup Bar , Fixing Of New Multi Chin-up Bar 15 Feet X 15 Feet , Upgradation Of Logs , Round Wooden Pole Of Thickness 5 Inch Of Height 7 Feet , Two Coast Of Oil Paint On All Obstacles , Upgradation Of Confidance Walk , Excavation Of Soil Up To 2 Feet , Upgradation Of Confidance Walk , Filling Of Fine Narmada Sand , Upgradation Of Confidance Walk , Brick Work Of Thickness 8 Inchand Plastering , Upgradation Of W Wall , Excavation Of Soil Up To 2 Feet , Upgradation Of W Wall , Filling Of Fine Narmada Sand , Upgradation Of W Wall , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of W Wall , Repairing Of Existing Wall And Plastering , Upgradation Of Pipe Crowling , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Swing And Ride , Excavation Of Soil Up To 2 Feet , Upgradation Of Swing And Ride , Filling Of Fine Narmada Sand , Upgradation Of Swing And Ride , Brick Work Of Thickness 8 Inch And Plastering , Upgradation Of Swing And Ride , Repairing Of Obstacle With Cement Mortar , Upgradation Of Rope Pully , Heavy Pulley System On The Existing Pole , , Upgradation Of Rope Pully , Excavation Of Soil Up To 2 Feet , Upgradation Of Rope Pully , Filling Of Fine Narmada Sand , Upgradation Of Rope Pully , Brick Work Of Thickness 8 Inch And Plastering , Leveling Of The Complete Area Surrounding Around The Obstacle