Web Analytics Made Easy - StatCounter

Tender for A)scope Of Work Covers Supply And Installation Of Pressure Switches And Pressure Guages Along With Accessories Required For Clinker Grinders And At The Other Areas Of Ahp Systems.the Contractor/agency Shall Supply The Materials As Per The Technical Specifications And Requirement.c)before Quoting The Bid/supply Of Materials, The Contractor/agency Should Visit To Rtps Site For The Assessment Of Site Conditions And To Knew About The Sample Materials,so As To Supply The Quality/branded Materials As Per The Customer Requirement. D)it Is The Single Point Responsibility Of The Contractor/agency To Supply And Install The Materials Under The Supervision Of Site Engineer.e)the Manpower And T&p Required For The Installation Of Supplied Materials Shall Be Arranged By The Contractor/agency Itself. F)the Contractor/agency Shall Replace The Supplied Materials At Free Of Cost, If It Got Damaged During Transit Or While Carrying Out Installation Work.g)the Contractor/agency Shall Complete The Supply & Installation Work Within The Contract Period,otherwise Penalty Will Be Imposed As Per The Penalty Clause Mentioned In The Bid Document. H) The Contractor/agency Shall Handover The Site To Kpcl In Healthy And Good Condition After Completion Of Work. in Raichur - Karnataka

Tender Details
Reference # :
42150657
Description :
Tenders for A)scope Of Work Covers Supply And Installation Of Pressure Switches And Pressure Guages Along With Accessories Required For Clinker Grinders And At The Other Areas Of Ahp Systems.the Contractor/agency Shall Supply The Materials As Per The Technical Specifications And Requirement.c)before Quoting The Bid/supply Of Materials, The Contractor/agency Should Visit To Rtps Site For The Assessment Of Site Conditions And To Knew About The Sample Materials,so As To Supply The Quality/branded Materials As Per The Customer Requirement. D)it Is The Single Point Responsibility Of The Contractor/agency To Supply And Install The Materials Under The Supervision Of Site Engineer.e)the Manpower And T&p Required For The Installation Of Supplied Materials Shall Be Arranged By The Contractor/agency Itself. F)the Contractor/agency Shall Replace The Supplied Materials At Free Of Cost, If It Got Damaged During Transit Or While Carrying Out Installation Work.g)the Contractor/agency Shall Complete The Supply & Installation Work Within The Contract Period,otherwise Penalty Will Be Imposed As Per The Penalty Clause Mentioned In The Bid Document. H) The Contractor/agency Shall Handover The Site To Kpcl In Healthy And Good Condition After Completion Of Work.
Ownership :
Sector :
Tender Values
Value :
2,472,369
EMD :
49,448
Doc. Cost :
620
Important Dates
Due date :
24 Oct, 2025
Open date :
27 Oct, 2025
Publish date :
04 Oct, 2025
Location
Location :
Raichur - Karnataka ( IN )
Connect us via What's Up