Web Analytics Made Easy - StatCounter

Tender for Supply Of Labour For Disconnecting Existing Ht Lt Supply From Defective Transformer Disconnection Complete All As Directed By Engr-in-charge , Labour For Crane For Lifting Transofrmer In The Veh And Transportation Complete All As Directed By Engr-in-charge , S And F Hv Side Windings With Suitable Size Of Copper Conductor Complete All As Directed By Engr-in-charge , S And F Lv Side Windings With Suitable Size Of Copper Conductor Complete All As Directed By Engr-in- Charge , Labour For Oven Charging For Transformer Windings Complete All As Directed By Engr-in-charge , S And F New Transformer Oil, Low Viscosity Of Dielectric Strength Complete All As Directed By Engr-in-charge , S And F Tape, Paper Insulating Strings Etc Gently And Carefully, Washing Of The Dust, Complete All As Directed By Engr-in-charge , Painting Of The Inner And Outer Side Of The Transformer With Zinc Chromate Complete All As Directed By Engr-in-charge , Supply And Fix Ht Porecelain Bushing Complete With Brass Tinned Complete All As Directed By Engr-in-charge , Supply And Fix Lt Porecelain Bushing Complete With Brass Tinned Copper Rod Complete All As Directed By Engr-in-charge , Supply And Fix Tap Cahnger Switch 11 Kv Complete With Rod And Gasket Complete Complete All As Directed By Engr-in- Charge , Supply And Fix Breather Assy With New Silica Gel Complete All As Directed By Engr-in-charge , Testing Of The Transformer After Repair As Directed By Engr-in-charge , Labour For Shifting Of Trolly Mounted Transformer 315 Kva From Age Em Sub Divn To The Proposed Site And Same Will Be Return Back After Completion Of Wk Complete All As Directed By Engr-in-charge , Labour For Disconnecting Existing Ht Supply From Transformer And Opening The Complete All As Directed By Engr-in-charge , S And F Gaskets Of Suitable Size Sealing Washers O Rings And Other Consumbels Such As Tape, Paper Insulating Strings Etc All As Reqd At Site Complete All As Directed By Engr-in-charge , Supply And Fix New Silica Gel Of Blue Colour Complete All As Directed By Engr-in-charge , Dehydration Filtaration Of Old Transformer Oil At Site With Protable Complete All As Directed By Engr-in-charge , S And F New Transformer Oil, Low Viscosity Of Dielectric Strength Not Less Than 50 Kvcomplete All As Directed By Engr-in-charge , M And L For Dismantling Motors Upto 2.20 Kw Capacity Complete All As Directed By Engr-in-charge , Material And Labour For Repairing Servicing The 3 Phase 415v Electric Induction Motor Complete All As Directed By Engr-in-charge , M And L For Testing Of Alignment Of Door Tracks Rails Both Sides By Complete All As Directed By Engr-in-charge , Taking Down Old Unsv Gears, Pinion, Warm Gear Etc And Supply And Fixing New Gears, Complete All As Directed By Engr-in-charge , S And F Iron Cable Carrier Rollers Complete All As Directed By Engr-in-charge , Supply In Replacement Of Wheel Bearing Complete All As Directed By Engr-in-charge , S And F In Replacement Of Pvc Sheathed Multistranded Flexible Copper Cable Of 3 Core 4.0 Sqmm 1100 Volt Grade Complete All As Directed By Engr-in-charge , Decarburizing Cleaning Complete Control Panel Of By Cleaning Bus Bar Chamber Complete All As Directed By Engr-in-charge , Supply In Filling Of Gear Oil Sp 320 For Top Up Upto To Required Level Or In Replacement Of Unserviceable Oil Complete All As Directed By Engr-in-charge , Supply In Refilling Of Grease Including Cleaning Of Old Grease Complete All As Directed By Engr-in- Charge , S And F In Replacement Of Single Phase Preventor As Per Existing Make And Model Complete All As Directed By Engr-in-charge , S And F In Replacment Of Power Contactor Of //bid Details 2 / 27 Capacity 40 Amp, 3 Pole Suitable Complete All As Directed By Engr-in-charge in Barmer - Rajasthan

Tender Details
Reference # :
42617266
Description :
Tenders for Supply Of Labour For Disconnecting Existing Ht Lt Supply From Defective Transformer Disconnection Complete All As Directed By Engr-in-charge , Labour For Crane For Lifting Transofrmer In The Veh And Transportation Complete All As Directed By Engr-in-charge , S And F Hv Side Windings With Suitable Size Of Copper Conductor Complete All As Directed By Engr-in-charge , S And F Lv Side Windings With Suitable Size Of Copper Conductor Complete All As Directed By Engr-in- Charge , Labour For Oven Charging For Transformer Windings Complete All As Directed By Engr-in-charge , S And F New Transformer Oil, Low Viscosity Of Dielectric Strength Complete All As Directed By Engr-in-charge , S And F Tape, Paper Insulating Strings Etc Gently And Carefully, Washing Of The Dust, Complete All As Directed By Engr-in-charge , Painting Of The Inner And Outer Side Of The Transformer With Zinc Chromate Complete All As Directed By Engr-in-charge , Supply And Fix Ht Porecelain Bushing Complete With Brass Tinned Complete All As Directed By Engr-in-charge , Supply And Fix Lt Porecelain Bushing Complete With Brass Tinned Copper Rod Complete All As Directed By Engr-in-charge , Supply And Fix Tap Cahnger Switch 11 Kv Complete With Rod And Gasket Complete Complete All As Directed By Engr-in- Charge , Supply And Fix Breather Assy With New Silica Gel Complete All As Directed By Engr-in-charge , Testing Of The Transformer After Repair As Directed By Engr-in-charge , Labour For Shifting Of Trolly Mounted Transformer 315 Kva From Age Em Sub Divn To The Proposed Site And Same Will Be Return Back After Completion Of Wk Complete All As Directed By Engr-in-charge , Labour For Disconnecting Existing Ht Supply From Transformer And Opening The Complete All As Directed By Engr-in-charge , S And F Gaskets Of Suitable Size Sealing Washers O Rings And Other Consumbels Such As Tape, Paper Insulating Strings Etc All As Reqd At Site Complete All As Directed By Engr-in-charge , Supply And Fix New Silica Gel Of Blue Colour Complete All As Directed By Engr-in-charge , Dehydration Filtaration Of Old Transformer Oil At Site With Protable Complete All As Directed By Engr-in-charge , S And F New Transformer Oil, Low Viscosity Of Dielectric Strength Not Less Than 50 Kvcomplete All As Directed By Engr-in-charge , M And L For Dismantling Motors Upto 2.20 Kw Capacity Complete All As Directed By Engr-in-charge , Material And Labour For Repairing Servicing The 3 Phase 415v Electric Induction Motor Complete All As Directed By Engr-in-charge , M And L For Testing Of Alignment Of Door Tracks Rails Both Sides By Complete All As Directed By Engr-in-charge , Taking Down Old Unsv Gears, Pinion, Warm Gear Etc And Supply And Fixing New Gears, Complete All As Directed By Engr-in-charge , S And F Iron Cable Carrier Rollers Complete All As Directed By Engr-in-charge , Supply In Replacement Of Wheel Bearing Complete All As Directed By Engr-in-charge , S And F In Replacement Of Pvc Sheathed Multistranded Flexible Copper Cable Of 3 Core 4.0 Sqmm 1100 Volt Grade Complete All As Directed By Engr-in-charge , Decarburizing Cleaning Complete Control Panel Of By Cleaning Bus Bar Chamber Complete All As Directed By Engr-in-charge , Supply In Filling Of Gear Oil Sp 320 For Top Up Upto To Required Level Or In Replacement Of Unserviceable Oil Complete All As Directed By Engr-in-charge , Supply In Refilling Of Grease Including Cleaning Of Old Grease Complete All As Directed By Engr-in- Charge , S And F In Replacement Of Single Phase Preventor As Per Existing Make And Model Complete All As Directed By Engr-in-charge , S And F In Replacment Of Power Contactor Of //bid Details 2 / 27 Capacity 40 Amp, 3 Pole Suitable Complete All As Directed By Engr-in-charge
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
17 Nov, 2025
Open date :
17 Nov, 2025
Publish date :
06 Nov, 2025
Location
Location :
Barmer - Rajasthan ( IN )
Connect us via What's Up