Description :
Tenders for Scope Of Work (sow) As Mentioned In Tender And Schedule Of Work( 58 )items As Given Below ,[1] Disman,cross Bar Supply Sys Strl Etc 4.000 To,[2] Instln,column,i-beam Etc 6.000 To,[3] Mtg,cbl Carrier 20.000 Set,[4] Mtg,cbl Carrier,layg Of Cbl 200.000 M,[5] Preparing,surface Paintg Of Str 3.000 Le,[6] Fixg,contactor&panel Testg 3.000 Ea,[7] Positioning,panel 4.000 Ea,[8] Commng,crane 3.000 Set,[9] Wrng,breaker Pnl,lcp,remote Ctrl Pnl 2.000 Le,[10] Instln,radio Remote Ctrl Unit 3.000 Set,[11] Rprg,panel Door&back Side Cover 25.000 Ea,[12] Fab,missing Panel Cover&door 16.000 Ea,[13] Instln,shunt Limit Swi,6nos 7.000 Ea,[14] Chng,defective Fastoon Carrier 80.000 Ea,[15] Svcg,electromagnetic Brake 3.000 Ea,[16] Clng,crane Panel&resistance Box 20.000 Le,[17] Clng Cont Tip Tip And Gap Adjst F/cran 90.000 Ea,[18] Rplcg Dc Motor F/crane 10.000 Ea,[19] Maint Dc Motor F/crane 3.000 Ea,[20] Maint Of Mag Cbl Drum F/crane 6.000 Ea,[21] Rplcg Brake In Crane 8.000 Set,[22] Fab,bracket F/fixg Cfs 7.000 Le,[23] Fab Of Wrking Platform 3.000 To,[24] Rplcg Resi Box F/crane 25.000 Ea,[25] Fab, Ern Insulator Base 60.000 Ea,[26] Replcg,mtr Armature&field Cbl 2.000 Ea,[27] Greasing Festoon Trolley W/alignment 25.000 Ea,[28] Disman,damaged Mtr,brake,limit Swi 8.000 Ea,[29] Dismntld Clning&erectn Of Motor 8.000 Ea,[30] Svcg,ecr&ecr Basement Eqpt 650.000 Ft3,[31] Svcg,furnace,mill&cooling Bed Cvdc Room 800.000 Ft3,[32] Maint,mtr Room Basement Eqpt 850.000 Ft3,[33] Svcg,binding&bundling,bar Shear Area 800.000 Ft3,[34] Arrangement,illumination 80.000 Le,[35] Layg,cbl 3500.000 M,[36] Servicing Of Cabin Fan 20.000 Set,[37] Fab&ern,jb 30.000 Ea,[38] Fixg,cfs/isolator 45.000 Ea,[39] Pt Wrng,supply Of Swi W/board 90.000 Ea,[40] Clng,ctrl Panel Interior&exterior 20.000 Set,[41] Remvng,dirt,dust Accumulation,27.4m 6.000 Le,[42] Svcg,emer Ltg Sys 80.000 Ea,[43] Svcg,existing Fitg,100nos 100.000 Ea,[44] Svcg,light Db 95.000 Ea,[45] Instln,peripheral Light 12.000 Ea,[46] Techl Clng,cbl Tunnel 30.000 M3,[47] Serv & Ele Maint For Main Roll Shop 1.000 Ea,[48] Svcg,lathe M/c 15.000 Ea,[49] Disman,high Bay Light Fitg 100.000 Ea,[50] Disman,existing Mtr&mtr Base Frame 7.000 Le,[51] Modn,mtr Fdn/base 7.000 Ea,[52] Fixg,new Mtr On Fabricated New Base 7.000 Ea,[53] Supply,contactor,coil Volt 220vac 10.000 Ea,[54] Svcg,blower Fan&mtr 20.000 Ea,[55] Drsng,cbl In Cbl Gallery 1.000 Le,[56] Disposal,scrap,site-place,within 1 Km 1.000 Le,[57] Fitg,tb 3.000 Ea,[58] Transportation To And Fro 3.000 Ea