Description :
Tenders for Corrigendum : Design, Engineering, Supply, Installation, Testing, Commissioning Of 40 Kw/100 Kwh Battery Energy Storage System (bess) With Integrated Ev Charging Infrastructure (2 X 7.4 Kw Ac) At Bikalpa Shakti Bhavan Including 5(five) Years Comprehensive Maintena - Design, Engineering, Supply, Installation, Testing, Commissioning of 40 kW/100 kWh Battery Energy Storage System (BESS) integrated with the existing 30 kWp Grid-Tied Building Integrated Photovoltaic (BIPV) to support power system critical operations of the building with integrated EV charging infrastructure (2 X 7.4 kW AC) at Bikalpa Shakti Bhavan including 5(five) years comprehensive maintenance on turnkey basis.