Description :
Tenders for Scr Construction Organization: Conducting Joint Inspection, Final Location Survey, Conducting Geotechnical Investigation, Development And Preparation Of Gads, Preparation Of Detailed Estimate, Detailed Project Report, Preparation Of Detailed Design And Drawings For Foundation, Sub-structure & Superstructure Of Road Over Bridge (rob) / Road Under Bridge (rub) Including Viaduct Spans And Approaches; Design Of Reinforced Earth Wall & Retaining Wall, Preparation Of Land Acquisition Proposals; Preparation Of Boq, Preparation Of Tender Document With Technical Specifications As Per Relevant Codes/manuals For Construction Of Robs/rubs" In South Central Railway