Web Analytics Made Easy - StatCounter

Tender for Supply, Erection, Commissioning And Testing Of Igbt Based 3-phase Drivepropulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi-functional Vehicle Bus (mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link And Cu Braid Required For Connection Between Main Transformer And Traction Converter, Auxiliary Converter, Interfacing Connectors, Cables And Cable Loom Required For Connection From Vcu 1/2 To Sb1/2 Panel. As Per Specification No. I)rdso/2008/el/spec/0071, Rev.5 For Igbt Based 3-phase Drive Propulsion Equipment, Ii) Clw/es/3/0458 Alt.e Or Latest For Control Cables Iii) Clw/es/3/0459 Alt.c Or Latest For Screenedcable Iv) Clw/es/3/0124 Alt.o Or Latest. The Detailed Scope For Erection Isenclosed At Annexure-a. Note: -the Scope Shall Also Include The Removal Of Allexisting Gto-based Equipment, Viz. Burs, Srs, And Vcus Etc., Directly Related To The Provision Of The Igbt-based 3-phase Drive Propulsion System Withphysical Medium, As Required For The Integration Of The New Equipment. Thedetailed Scope For Erection Is Enclosed At Annexure-a. Associated Equipmentremoved During The Replacement From Gto To Igbt Shall Be Refitted (as Per Thesite Engineer's Guidelines), As Necessary, To Ensure Proper Functioning Of The Igbtpropulsion System. The Firm Shall Ensure That, Upon Completion, The Propulsionsystem Is Fully Functional In All Respects. All Works And Accessories Necessary Toachieve This Objective, Whether Explicitly Mentioned Herein Or Not, Shall Be Deemedto Be Included In The Scope.(documents Attached) in Medchal-T - Telangana

Tender Details
Reference # :
43042189
Description :
Tenders for Supply, Erection, Commissioning And Testing Of Igbt Based 3-phase Drivepropulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi-functional Vehicle Bus (mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link And Cu Braid Required For Connection Between Main Transformer And Traction Converter, Auxiliary Converter, Interfacing Connectors, Cables And Cable Loom Required For Connection From Vcu 1/2 To Sb1/2 Panel. As Per Specification No. I)rdso/2008/el/spec/0071, Rev.5 For Igbt Based 3-phase Drive Propulsion Equipment, Ii) Clw/es/3/0458 Alt.e Or Latest For Control Cables Iii) Clw/es/3/0459 Alt.c Or Latest For Screenedcable Iv) Clw/es/3/0124 Alt.o Or Latest. The Detailed Scope For Erection Isenclosed At Annexure-a. Note: -the Scope Shall Also Include The Removal Of Allexisting Gto-based Equipment, Viz. Burs, Srs, And Vcus Etc., Directly Related To The Provision Of The Igbt-based 3-phase Drive Propulsion System Withphysical Medium, As Required For The Integration Of The New Equipment. Thedetailed Scope For Erection Is Enclosed At Annexure-a. Associated Equipmentremoved During The Replacement From Gto To Igbt Shall Be Refitted (as Per Thesite Engineer's Guidelines), As Necessary, To Ensure Proper Functioning Of The Igbtpropulsion System. The Firm Shall Ensure That, Upon Completion, The Propulsionsystem Is Fully Functional In All Respects. All Works And Accessories Necessary Toachieve This Objective, Whether Explicitly Mentioned Herein Or Not, Shall Be Deemedto Be Included In The Scope.(documents Attached)
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
05 Jan, 2026
Open date :
05 Jan, 2026
Publish date :
03 Dec, 2025
Location
Location :
Medchal-T - Telangana ( IN )
Connect us via What's Up