Web Analytics Made Easy - StatCounter

Tender for Electrical(g) Portion Of The Work For-(1) Construction Of Rub At Km. 725/25-27 In Lieu Of Lc No. 369 Between Bsp-dph Section In Howrah-mumbai Main Line (2) Construction Of Rub Near Lc No. 375(otgan) In Between Byl-dgs Section (km. 739/3-5) On Howrah-mumbai Main Line (3) Construction Of Rub By Box Pushing Method In Lieu Of Lc No. 376 At Km. 741/26 Between Npi-dgs Section On Ngp-hwh Main Line. (4) Provision Of Rub In Lieu Of Lc No.389 At Km.774/13-15 Between Byt-hn Station. (5) Construction Of Rub On Km. 785/23-25 In Lieu Of Lc No. 394(khapari Gate) In Between Hn-tld Section In Howrah-mumbai Main Line (6) Construction Of Rub On Km. 807/7-9 In Lieu Of Lc No. 406, Between Slh-mdh Section In Howrah-mumbai Main Line (7) Construction Of Rub At Km 874/2-3 In Lieu Of Manned Lc No. Dd-8 Between Mxa-rsa Section Of Raipur Division. (8) Construction Of Rub At Km 889/7-8 In Lieu Of Manned Level Crossing No. Dd-19 At Rsa Yard Of Raipur Division. (9) Construction Of Rub At Km 947/1-2 In Lieu Of Manned Lc No. Dd-59 At Kys Yard Of Raipur Division.(10)construction Of Rpf Out-post With Guard Room Rest Room At Antagarh (11) Construction Of Rpf Out-post With Guard Room Rest Room At Taroki (12) Construction Of Rpf Out-post With Guard Room Rest Room At Rowghat (13) Gym At 07 Barrack (barrack At Raipur, Wrs, Byt, Bia, Bmy, Durg, Drz). in Durg - Chhattisgarh

Tender Details
Reference # :
43817699
Description :
Tenders for Electrical(g) Portion Of The Work For-(1) Construction Of Rub At Km. 725/25-27 In Lieu Of Lc No. 369 Between Bsp-dph Section In Howrah-mumbai Main Line (2) Construction Of Rub Near Lc No. 375(otgan) In Between Byl-dgs Section (km. 739/3-5) On Howrah-mumbai Main Line (3) Construction Of Rub By Box Pushing Method In Lieu Of Lc No. 376 At Km. 741/26 Between Npi-dgs Section On Ngp-hwh Main Line. (4) Provision Of Rub In Lieu Of Lc No.389 At Km.774/13-15 Between Byt-hn Station. (5) Construction Of Rub On Km. 785/23-25 In Lieu Of Lc No. 394(khapari Gate) In Between Hn-tld Section In Howrah-mumbai Main Line (6) Construction Of Rub On Km. 807/7-9 In Lieu Of Lc No. 406, Between Slh-mdh Section In Howrah-mumbai Main Line (7) Construction Of Rub At Km 874/2-3 In Lieu Of Manned Lc No. Dd-8 Between Mxa-rsa Section Of Raipur Division. (8) Construction Of Rub At Km 889/7-8 In Lieu Of Manned Level Crossing No. Dd-19 At Rsa Yard Of Raipur Division. (9) Construction Of Rub At Km 947/1-2 In Lieu Of Manned Lc No. Dd-59 At Kys Yard Of Raipur Division.(10)construction Of Rpf Out-post With Guard Room Rest Room At Antagarh (11) Construction Of Rpf Out-post With Guard Room Rest Room At Taroki (12) Construction Of Rpf Out-post With Guard Room Rest Room At Rowghat (13) Gym At 07 Barrack (barrack At Raipur, Wrs, Byt, Bia, Bmy, Durg, Drz).
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
02 Mar, 2026
Open date :
02 Mar, 2026
Publish date :
02 Feb, 2026
Location
Location :
Durg - Chhattisgarh ( IN )
Connect us via What's Up