Description :
Tenders for Auction Sale Of Others - Scrap Condemned And Unserviceable Released/abandoned Structus Building At Station -utd (quarter No T/17 Type 1 Unit 1, Quarter No T/18 & 19 Type 1 Unit 4) Station- Kbrv (quarter No T/25 Type 1 Unit 2, Quarter No E/19,20,21&22 Type 1 Unit 8) Station ¿ Nd (quarter No E/102 Type 1 Unit 2, Lc-277 Nd-gte( Cabin At Lc-277,service Bld. Unit 1) Lc 283 Gte ( Cabin At Lc 283, Service Bld. Unit 1) Gte- Mhd (quarter At Lc 286 Type 1 Unit 2) Lc 296 Kanj ( Cabin At Lc 296, Service Bld. Unit 1) Station- Mhd ( Quarter No E/68 Type 1 Unit 4) Station ¿bjd Overhead Tank Unit 1 Total Unit- 27. Total[ Brick Works 272.62 Cum, Precast/rcc Slab 272.99 Cum, Wooden & Ms Door Frame In Off Size 45 Nos, Wooden, Ms Window & Ventilator Frame In Off Size 30 Nos, Wooden Rafter/beam 2.62 Cum,wooden Jafari & Jafari Doors 11.32 Sqm, Pvc Doors 15 Nos, Ac Sheet 337.9 Sqm. Rail 30 Lbs/90 R/69 Lbs/82 Lbs & Ms Item (daniya, Tie Bar, Tie Bar Fencing Flat, 12 Mm Rod, Rail Daniya, Angles, Sheet, Fencing, Parline Angle, Flat, Ms Pipe, C/yard Door Plate & Flat, Wind Tie Flat, Ismc, Ms Sheet, Stair Case, Isa, Flight Runner Etc.) Total Weight: 14695.03 Kg. Delivery- As A Lot. Custodian: Sse Works Nd. Note No. [1] Dismantling Up To Ground Level Only. Below Ground Level Is Not Permitted. [2] During Dismantling Purchaser Should Take Necessary Measures To Avoid Any Mishaps. [3] Purchaser Should Insure To Keep A Safety Banner Arround The Work Spot. [4] After Removing /clearing The Rcc/bricks Masonary Rubbish From Spots The Delivery Of Wood/iron Material Will Be Affected. [5] After Delivery The Land Should Be Clear Of All Debris. [6] Free Delivery Period 50 Days. The Lot Details Are As Per Jvr And Measurement Sheet