Description :
Tenders for Supply Of Supply Installation Testing And Commissioning Of Providing Joints By Using Brazing Technique , Supply Installation Testing And Commissioning Of Copper Bonded Rod With Low Carbon Steel High Tensile Strength Copper Bonded Rod With Min 254 Microns Of Copper Plating , Excavation Of Soil For Making Trench , Laying Or Fixing Of Hdpe Conduit Or Pipe Underground Or Surface Complete As Required As Per Site Condition , Laying Of 25mm Pvc Pipe , Laying Of 25mm Pvc Flexible Pipe For Indoor Complete As Required , Laying Of 25 Or 32mm Pvc Reinforceable Flexible Pipe Complete As Required , Laying Of Optical Fiber Cable End To End Ferruling Labeling And Termination Through Gi Conduit Or Pvc Pipe Complete As Required , Laying Of Cat6 Utp End To End Ferruling Labeling And Termination Through Pvc Pipe Complete As Required , Laying Of Electrical Cable End To End Ferruling Labeling And Termination Through Gi Conduit Or Pvc Pipe Complete As Required , Mounting And Fixing Of Gi Pole After Excavation Of Soft Or Hard Soil Including Cutting Of Bituminous Road Or Pavement , Mounting Fixing Labeling And Dressing Of Floor Standing Rack Complete As Required , Mounting Fixing Labeling And Dressing Of 6u Pole Mount Rack Complete As Required , Mounting Fixing And Labeling Of All Types Of Cameras Complete As Required , Installation Splicing Of All Ofc Core Rack To Server Rack Labelling Testing And Commissioning , Installation Of Db , Installation Of 2 X 15- Or 16- Amp Shuttered Switch Socket Combined With Cover Plate And Back Box For Surveillance Room End , Installation Of Electrical Box With 25 Amp Mcb 15 Or 16 Amp Socket At Rack End , Installation Testing And Commissioning Of 5kva Online Ups With 60 Min Backup Including Ups Output Electrification Complete As Required , Installation Testing And Commissioning Of Nvr Primary And Redundancy Complete As Required , Termination And Fixing Of Category 6 Utp Information Outlet , Mounting Fixing Installation And Configuration Of All Types Of Switches Complete As Required , Installation And Configuration Of Workstation Complete As Required , Installation And Configuration Of Point To Multipoint Radio With Accessories Complete As Required , Testing Commissioning Certification Providing 3 Sets Of Completion Diagram And Documentation Of Entire Project Complete As Required