Description :
Tenders for The Pipe Laying Work Was Completed Through The Shoulder But The Surface Of The Road Is Severely Damaged Than Shoulder Portion. The Pothole Filling With 36 Mm And 12 Mm Metal, 20 Mm Mss Patchwork Are Included In This Estimate