Web Analytics Made Easy - StatCounter

Tender for Supply Of A Boring Drilling 150 Mm Dia Bore Holes Upto 10 Mtr Depth , B Collection Of Disturbed And Undisturbed Soil Sample At Interval Of 1 Mtr , C To Carry Out The Test To Ascertain Soil Profile Proportion To Determine Safe Bearing Capacity Complete With Field , D Conduct Lab Test On Disturbed Soil Samples , E Conducting Lab Test On Undisturbed Soil Sample As Considered Necessary According To Relevant Specification , G Liquefaction Analysis To Be Enclosed With The Soil Investigation Report , H Recommendation For Pile Foundation With Pile Capacity , Submission Of Four Copies Of Ink Signed Test Report , The Sbc Of The Soil Is Required To Be Given As Per Following Table , With Every Site S Soil Investigation Report A Detailed Site Plan Showing The Approx Location Of Each Bore Duly Numbered As Per Log , Every Page Of The Soil Investigation Report , All Pages Of The Soil Investigation Report Shall Be Serially Numbered, Stamped And Signed , Transportation Charges Including Loading And Unloading Of Heavy Girders , Photographic Record Of Geo Explorations As Well As Testing Shall Also Form Part Of The Report , The Ge Shall Intimate The Approximate Type Of Construction , In Case Of Underground Buildings Basement Construction in Saharanpur - Uttar Pradesh

Tender Details
Reference # :
44391308
Description :
Tenders for Supply Of A Boring Drilling 150 Mm Dia Bore Holes Upto 10 Mtr Depth , B Collection Of Disturbed And Undisturbed Soil Sample At Interval Of 1 Mtr , C To Carry Out The Test To Ascertain Soil Profile Proportion To Determine Safe Bearing Capacity Complete With Field , D Conduct Lab Test On Disturbed Soil Samples , E Conducting Lab Test On Undisturbed Soil Sample As Considered Necessary According To Relevant Specification , G Liquefaction Analysis To Be Enclosed With The Soil Investigation Report , H Recommendation For Pile Foundation With Pile Capacity , Submission Of Four Copies Of Ink Signed Test Report , The Sbc Of The Soil Is Required To Be Given As Per Following Table , With Every Site S Soil Investigation Report A Detailed Site Plan Showing The Approx Location Of Each Bore Duly Numbered As Per Log , Every Page Of The Soil Investigation Report , All Pages Of The Soil Investigation Report Shall Be Serially Numbered, Stamped And Signed , Transportation Charges Including Loading And Unloading Of Heavy Girders , Photographic Record Of Geo Explorations As Well As Testing Shall Also Form Part Of The Report , The Ge Shall Intimate The Approximate Type Of Construction , In Case Of Underground Buildings Basement Construction
Ownership :
Sector :
Tender Values
Value :
40,000
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
20 Mar, 2026
Open date :
20 Mar, 2026
Publish date :
10 Mar, 2026
Location
Location :
Saharanpur - Uttar Pradesh ( IN )
Connect us via What's Up