Description :
Tenders for Rate Contract For Supply, Fabrication, Transportation, Installation And Commissioning Of Rvi Elements (i.e., Canopy/building Fascia, Indian Oil Logo/indian Oil Lettering /swagat Signage On Canopy/building Fascia, Directional/facility Signages, Air/wa - Rate Contract For Supply, Fabrication, Transportation, Installation And Commissioning Of Rvi Elements (i.e., Canopy/building Fascia, Indian Oil Logo/indian Oil Lettering /swagat Signage On Canopy/building Fascia, Directional/facility Signages, Air/water/ev Tower Canopies, Etc.) At Indian Oil Locations Under 16 Nos. Of State Offices. Notes: 1. Each Of The 16 Line Items Are Representing Unit Rates Of All Type Of Rvi Elements Wrt Rvi Works At Indian Oil Retail Outlet Under Respective State Offices. Bidder To Quote Only In The Lot(s) As Declared In Annexure-2 Of Technical Bid Document. 2. The Tenderers Are Supposed To Quote Percentage Excess, Less Or At Par Over The Entire Schedule Of Rates In The Price Band Of (-)20% And (+)5% Only, Which Shall Be Applicable Uniformally To All Items Of Purchase Requisition(pr) For Respective State Office. 3. Bidders To Quote Their Offer As Per Following Taking Into Consideration: 3.(a) Basic Unit Rate Given In Price Schedule Is Exclusive Of Gst And Only Gst Shall Be Payable, In Line With Taxation Clause Of Technical Bid Document. 3.(b) The Delivered Price For All The Bidders For The Respective State Offices, Shall Be Arrived By Adding The Quoted Price Of The Bidders And Applicable Gst (18%), However It Shall Be Guided By Special Clauses On Taxation. 3.(c) Before Filling Price Bid, The Tenderers Must Visit The Site/retail Outlet At Their Own Cost And Study Complete Tender Document Including Detailed Scope Of Work, Description / Specification Of Each Rvi Elements, Relevant Works & Logistics Of The Area. 4. The Corporation Shall Be Within Its Right To Execute Or Not To Execute Or To Partially Execute Or Exceed Any Of The Items As Mentioned In The Schedule Of Items And Rates. 5. The Party Has To Enter Bidder's Name & Percentage Quote, In The Designated Cells. 6. Gst (18%) Is Fixed & Shall Be Applied Accordingly. The Value In Column Ba Is Without Gst.