Web Analytics Made Easy - StatCounter

Tender for Corrigendum : Supply And Installation Of 3 Phase Hog Sequence Testing Kit With 60kva Transformer For Inspection Of Lhb Ac And Non-ac Coaches With Following Specifications. 1) Hog Sequence Testing Kit Shallbe Suitable For Input Supply Of 3 Phase, 415v With Neutral, 125a Four Poles Mccb Shall Be Provided Forinput Supply Side Protection Along With Suitable Rated Supply Chord (pvc) Of Length 5 Meters. 2) Hogsequencetesting Kit Shall Be Having Output Supply Provision Of 3 Phase With Neutral, 750v Ac With Ivcoupler Socket. 3) Uic Jumper Coupler Shall Be Having 16 Pin Male Connector To Suit Conventional Powercar Socket, The Cable Length Shall Be 3 Meters. 4) Hog Sequence Testing Kit Shall Be Having Auto Overvoltage Shut Down Facility. 5) Hog Sequence Testing Kit Shall Be Having The Output Capacity Of 60kva Forpower Side And 72 To 110v Dc For Control Side. 6) Hog Sequence Testing Kit Shall Have In Built Surgeprotection. 7) Hog Sequence Testing Kit Shall Be Having 4 Polemccb Protection At 750v Side, Withcurrent Rating 125a. 750v Ac Grade Not Available 690v Mccb Shall Be Used. 8) Hog Sequence Testing Kitshall Be Having Independent On/off And Rest Provision For Each Output. 9) Hog Sequence Testing Kitshall Be Having Proper Earthing Protection. 10) The Power Circuit And Control Circuit Arrangement Shall Beloco Part Of Drawing Entered In Annexure 1. 11) Hog Sequence Testing Kit Shall Be Supplied With Fourwheels Heavy Duty Trolley Two Revolving And Two Fixed One. 12) Hog Sequence Testing Kit Shall Bepowder Coated Paint Of Aqua Green Colour. 13) Hog Sequence Testing Kit Shall Be Supplied Along Withuser Manual. 14) Demonstration Shall Be Arranged Free Ofcost At Your Side. 15) Hog Sequence Testingkit Shall Be Suitably Designed At Both Sides. 16) Hog Sequence Testing Kit Shall Be Labeled Withnecessary Danger/safety Precaution Instructions Wherever Necessary. Pre Approval Of Drawing & Bom To Be Taken From Consignee Before Supply Of Item. [ Warranty Period: 30 Months After The Date Of Delivery ] in Hyderabad-T - Telangana

Tender Details
Reference # :
44843593
Description :
Tenders for Corrigendum : Supply And Installation Of 3 Phase Hog Sequence Testing Kit With 60kva Transformer For Inspection Of Lhb Ac And Non-ac Coaches With Following Specifications. 1) Hog Sequence Testing Kit Shallbe Suitable For Input Supply Of 3 Phase, 415v With Neutral, 125a Four Poles Mccb Shall Be Provided Forinput Supply Side Protection Along With Suitable Rated Supply Chord (pvc) Of Length 5 Meters. 2) Hogsequencetesting Kit Shall Be Having Output Supply Provision Of 3 Phase With Neutral, 750v Ac With Ivcoupler Socket. 3) Uic Jumper Coupler Shall Be Having 16 Pin Male Connector To Suit Conventional Powercar Socket, The Cable Length Shall Be 3 Meters. 4) Hog Sequence Testing Kit Shall Be Having Auto Overvoltage Shut Down Facility. 5) Hog Sequence Testing Kit Shall Be Having The Output Capacity Of 60kva Forpower Side And 72 To 110v Dc For Control Side. 6) Hog Sequence Testing Kit Shall Have In Built Surgeprotection. 7) Hog Sequence Testing Kit Shall Be Having 4 Polemccb Protection At 750v Side, Withcurrent Rating 125a. 750v Ac Grade Not Available 690v Mccb Shall Be Used. 8) Hog Sequence Testing Kitshall Be Having Independent On/off And Rest Provision For Each Output. 9) Hog Sequence Testing Kitshall Be Having Proper Earthing Protection. 10) The Power Circuit And Control Circuit Arrangement Shall Beloco Part Of Drawing Entered In Annexure 1. 11) Hog Sequence Testing Kit Shall Be Supplied With Fourwheels Heavy Duty Trolley Two Revolving And Two Fixed One. 12) Hog Sequence Testing Kit Shall Bepowder Coated Paint Of Aqua Green Colour. 13) Hog Sequence Testing Kit Shall Be Supplied Along Withuser Manual. 14) Demonstration Shall Be Arranged Free Ofcost At Your Side. 15) Hog Sequence Testingkit Shall Be Suitably Designed At Both Sides. 16) Hog Sequence Testing Kit Shall Be Labeled Withnecessary Danger/safety Precaution Instructions Wherever Necessary. Pre Approval Of Drawing & Bom To Be Taken From Consignee Before Supply Of Item. [ Warranty Period: 30 Months After The Date Of Delivery ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
08 May, 2026
Open date :
08 May, 2026
Publish date :
10 Apr, 2026
Location
Location :
Hyderabad-T - Telangana ( IN )
Connect us via What's Up