Description :
Tenders for Supply Of Lwsczac Shell Kit 534 A One Coach Set Of Roof, Sidewall And End Wall For Lwsczac 534 1. Roof Assembly To Drg No 53416001, Alt 'c' - 1 No, 2. Final Roof Element Cpl To Drg No. 87716014, Alt 'e' - 2 Nos. 3. Final Roof Element Cpl To Drgno. 87716015, Alt 'e' - 2 Nos. 3. Side Wall To Drg No. 53414001, Alt 'd' - 1 No. 4. Endwall To Drg No 59315007, Alt 'b' - 2 Nos. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-200, Issue Status-01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-315, Issue Status-01,rev.00, With Amendment No 01. B One Coach Set Of Welding Parts On Body Shell And Partition Frames For Lwsczac Coaches To Drg. No. 1. (lwsczac) 53410002, Alt 'b' - 1 No. 2. (lwsczac) 53410054, Alt 'l' - 1 No. 3. 58110016, Alt 'a' - 6 Nos. 4. 58110015, Alt 'a' - 3 Nos. 5. Aaa10972, Alt 'a' - 3 Nos. 6. Aaa10976, Alt 'nil' - 1 No. 7. Aaa10977, Alt 'nil' - 1 No. 8. Aaa10978, Alt 'nil' - 1 No. 9. Aaa10979, Alt 'nil' - 1 No. 10. Aab10007, Alt 'a' - 4 Nos. 11. Aaa10963, Alt 'nil' - 2 Nos. 12. Ssa10018, Alt 'nil' - 3 Nos. 13. Aaa10967, Alt 'nil' - 1 No. 14. Ssa10021, Alt 'nil' - 2 Nos. 15. 58110017, Alt 'c' - 2 Nos. 16. Aaa10970, Alt 'nil' - 4 Nos. 17. Aaf10937, Alt 'nil' - 3 Nos. 18. (lwsczac)53410001, Item.25, Alt 'r' - 12 Nos. 19. Aab10014, Alt 'nil' - 4nos. C Under Frame Arrangement To Drg No. 85111001 Col 1. Alt 'p' - 1 No. Firm Shall Fulfillthe Manufacturing Facility As Per Icf/md/spec-147, Issue Status 01 Rev.02 With Amendment No.02. Special Condition : Packing As Per Icf/j&t/misc-2201, Alt 'e'. Packing As Per Icf/j&t/sk-1809, Alt 'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/j&t/sk-1865, Alt 'a'. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ]